Loading...
Reso 1248-07/2005 RESOLUTION NO. 1248 RESOLUTION OF THE BOARD OF DIRECTORS OF THE VALLECITOS WATER DISTRICT CERTIFYING AS COMPLETE AND ADEQUATE THE SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT FOR THE VALLECITOS WATER DISTRICT UPDATED WATER, WASTEWATER AND WATER RECLAMATION MASTER PLAN, ADOPTING FINDINGS AND MITIGATION MONITORING PLAN, AND APPROVING THE 2002 MASTER PLAN UPDATE _._;,1 WHEREAS, the Vallecitos Water District ("District") Board of Directors has detennined that an update to the 1997 Water, Wastewater and Reclamation Master Plan ("2002 Master Plan Update" or 'Project') is required for orderly planning and to meet the water and sewer needs of the Residences of the District; and WHEREAS, in conjunction with the 2002 Master Plan Update, a Supplemental Environmental Impact Report (SEIR) has been prepared (State Clearinghouse [SCH} number 97021033), which incorporated the 1991 Program EIR (SCH number 9001 0707) and the 1997 Master Plan Update EIR (also SCH number 97021033), and which analyzed the incremental environmental changes which have occurred since the adoption of the 1991 Master Plan and 1997 Master Plan Update; and WHEREAS, the SEIR for the 2002 Master Plan was prepared pursuant to the provisions of the California Environmental Quality Act ('CEQA"), as amended; and WHEREAS, the draft SEIR was distributed to those public agencies having jurisdiction by law with respect to the Project and to other interested persons and agencies for review and comment for a period of forty five (45) days; and . . ..' . . WHEREAS, notice of the draft SEIR was posted in accordance with section 21091 of the California Public Resources Code; and WHEREAS, one public hearing was conducted during the review period to provide an additional forum for public input; and WHEREAS, written comments were received from responsible agencies and the public; and WHEREAS, the final SEIR, including responses to comments, has been prepared; and , WHEREAS, the District has reviewed and considered the SEIR prior to acting on the proposed Project and has certified that the SEIR has been completed in compliance with CECA Guidelines; and t ~ , WHEREAS, the District has determined that the SEIR adequately addresses the impacts of '- the Project being considered and that mitigation measures have been incorporated Into the proposed Project which substantially lessen the significant environmental effects of the Project as identified in theSEIR; and . - - --":;v" '.~.--...........-. i , ! , 1 I I, I I , I , I ~ ~ , Resolution No. 1248 Page 2 WHEREAS, the District has reviewed the environment documentation comprising the SEIR and has found that the SEIR considers all environmental impacts of the proposed Project and is complete and adequate and fully complies with all requirements of CEQA and the CEQA Guidelines; NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Vallecitos Water District as follows: Section 1: The Board of Directors of the Vallecitos Water District does hereby certify the final SEIR as complete and adequate in that it addresses all the environmental effects of the proposed changes to the Project and fully complies with the requirements of CEQA and the CECA Guidelines. Section 2: The Board of Directors hereby adopts the Statement of Findings (attached hereto as Exhibit "A") incorporated herein by this reference, which finds that the mitigation measures described in SEIR should mitigate all identified potentially significant adverse effects of the proposed changes to the Project to a less than significant level. Section 3: The Board of Directors hereby adopts the Mitigation Monitoring Plan (attached hereto as Exhibit "B") incorporated herein by this reference. Section 4: The Board of Directors hereby adopts the 2002 Master Plan and directs that the General Manager file an amended notice of detennination with the San Diego County Clerk and appropriate documentation with all Federal, State and Local Agencies. PASSED, APPROVED AND ADOPTED by the Board of Directors of the Vallecitos Water District at a regular meeting held on this 6th day of July, 2005 by the following roll call vote: AYES: NOES: ABSTAIN: ABSENT: GENTRY,HANNAN,SHELL,FERGUSON DAVY ~" Margan~ E. Ferguson, Pre . ent Board of Directors Val/ecitos Water District ATTEST: L0tQtJ Lii)P William W. Rucker, Secretary Board of Directors Vallecitos Water District _=J Resolution No. 1248 Page 3 EXHmIT A A. STATEMENT OF FINDINGS CEQA prohibits a public agency from approving or carrying out a project for which a CEQA document has been completed which identifies one or more significant adverse environmental effects of the project unless the public agency makes one or more written findings for each of those significant effects, accompanied by a brief explanation of the rationale for each finding (CEQA Guidelines 915091). The following sets forth the findings of the Vallecitos Water District ("District") for significant adverse impacts identified in the Supplemental Environmental Impact Report (SEIR). The findings are supported by substantial evidence in the record as explained in each finding. This Statement of Findings will be included in the record of project approval. FINDING: The District finds that the proposed project could result in potentially significant adverse impacts to biological resources, cultural resources, air quality, visual quality, noise, traffic and circulation, geology and soils, and hydrology/water quality. Explanation: The final SEIR (see Table 2-1 Environmental Impacts Summary) shows that potentially significant impacts could occur from Master Plan projects and activities as noted in the table. FINDING: The Vallecitos Water District finds that imposition of the mitigation measures contained in the final SEIR would reduce all identified potentially significant adverse environmental impacts to a less than significant level. Explanation: The final SEIR identifies mitigation measures for each of the potentially significant adverse impacts that may be caused by the project. These measures are summarized in Table 2-1 of the final SEIR and are listed in detail in the project Mitigation Monitoring Plan (see fmal SEIR Appendix B). B. STATEMENT OF FINDINGS CONCLUSION Changes or alterations have been incorporated into the project to mitigate or minimize the potentially significant adverse environmental effects associated with all project impacts. Feasible mitigation measures identified in the final SEIR have been adopted as set forth in the mitigation monitoring program. These measures would reduce all potentially significant project impacts to a less than significant level. Of the alternatives considered in the SEIR, the District finds that the proposed project achieves the best balance between minimizing potential adverse environmental impacts and achieving the project objectives. The District further finds that all of the findings presented here are supported by substantial evidence in the record. The record of approval for this project may be found in the District's office located at 201 Vallecitos de Oro, San Marcos, California. Resolution No. 1248 Page 4 EXHIBIT B Kennedy/Jenks Consultants 16855 W. Bernardo Dr., Suite 360 San Diego, California 92127-1667 858-676-3620 858-676-3625 (Fax) Vallecitos Water District Water, Wastewater, and Water Reclamation Master Plan Update Final Supplemental Environmental Impact Report Mitigation Monitoring and Reporting Program ?R ,Ii on'" ?nn<; Prepared for Vallecitos Water District 201 Vallecitos de Oro San Marcos, California 92069 K1J Project No. 014670.03 Resolution No. 1248 Page 5 Table of Contents Section 1: Section 2: Background and Project Description.......................................... 1 1.1 Background.......................................................................................... 1 1.2 Project Objective '.' ................. ... .... ... ........... c............ ......... ..... ... ..... ... ... 1 1.3 Project Description Summary............................................................... 2 1.3.1 Water ................................................................................2 1.3.2 Wastewater and Reclaimed Water ........................................... 2 1.4 Guidelines for Project-Specific Mitigation Monitoring and Reporting Program ..................... .............. ................... ... ............... ... .... 3 Mitigation Monitoring and Reporting Program............................ 5 2.1 Master Plan Mitigation Monitoring and Reporting Program................... 5 2.2 Mitigation Measures and Monitoring Strategies................................... 5 2.2.1 Land Use 6 2.2.1.1 Summary of Impacts ...............................................6 2.2.1.2 Mitigation Measures ................................................6 2.2.1.3 Mitigation Monitoring ............................................... 6 2.2.2 Biological Resources ................................................................ 7 2.2.2.1 Summary of Impacts ...............................................7 2.2.2.2 Mitigation Measures ................................................7 2.2.2.3 Mitigation Monitoring ........................................,.....10 2.2.3 Cultural Resources ..................................................................1 0 2.2.3.1 Summary of Impacts ..............................................10 2.2.3.2 Mitigation Measures ..............................................11 2.2.3.3 Mitigation Monitoring ..............................................12 2.2.4 Air Quality 12 2.2.4.1 Summary of Impacts ..............................................12 2.2.4.2 Mitigation Measures ...............................................13 2.2.4.3 Mitigation Monitoring ..............................................13 2.2.5 Visual Quality .......................................................................,..14 2.2.5.1 Summary of Impacts ..............................................14 2.2.5.2 Mitigation Measures ...............................................14 2.2.5.3 Mitigation Monitoring ..............................................14 2.2.6 Noise 14 2.2.6.1 Summary of Impacts ..............................................14 2.2.6.2 Mitigation Measures ......................................,........15 2.2.6.3 Mitigation Monitoring ..............................................15 2.2.7 Traffic/Circulation...... ................ ....... .... ................ ....... ... ... ..... ..16 2.2.7.1 Summary of Impacts ..............................................16 2.2.7.2 Mitigation Measures ...............................................16 2.2.7.3 Mitigation Monitoring ..........................................,...16 2.2.8 Geology and Soils ...................................................................17 2.2.8.1 Summary of Impacts ..............................................17 Val/ecitos Water District, Administrative Draft Master Plan SEIR '11:\Wp\:;sb(jo(;1'a51erpi~n'.;1pp~ndix,.,b mmr!) l} 14,05.&.)<; Resolution No. 1248 Page 6 Table of,Contents (cont'd) 2.2.8.2 Mitigation Measures ...............................................17 2.2.8.3 Mitigation Monitoring ..............................................19 2.2.9 HydrologylWater Cuality..........................................................19 2.2.9.1 Summary of Impacts ..............................................19 2.2.9.2 Mitigation Measures ...............................................20 2.2.9.3 Mitigation Monitoring ..............................................21 Valleeitos Water District, Administrative Draft Master Plan SEIR m;\""'CsMoclr;J';I~~kjn.~'lp~x__b mmm6-1f..05.d.'lc ii Resolution No. 1248 Page 7 Section 1: Background and Project Description This section contains the background, objectives, and description of the Vallecitos Water District (District) Water, Wastewater, and Water Reclamation Master Plan Update. The regulatory setting and guidelines for a Mitigation Monitoring and Reporting Program (MMRP) are also presented in this section. 1.1 Background This MMRP has been prepared for the Vallecitos Water District Water, Wastewater, and Water . Reclamation Master Plan Update. The project was initially described and analyzed in the 1991 Water, Wastewater, and Water Reclamation Master Plan Program Environmental Impact Report (1991 PEIR) (KEA, 1991), and was reevaluated in the 1997 Water, Wastewater, and Water Reclamation Master Plan Update Supplemental EIR (1997 SEIR) (COM, 1997). In 2002, the District again updated its Master Plan, resulting in the 2002 Water, Wastewater, and Water Reclamation Master Plan Update (2002 Master Plan Update). In order to comply with California Environmental Cuality Act (CECA) requirements, the District has prepared an SEIR for the Water, Wastewater, and Water Reclamation Master Plan Update (2004 SEIR) that focuses primarily on the' environmental impacts of new or modified projects as reflected in the 2002 Master Plan Update. Proposed water improvements include pipelines, pump stations, pressure reducing stations, and storage reservoirs. Proposed wastewater improvements include gravity sewers, force mains, and lift stations. The 2002 Master Plan Update also revises water and wastewater demand projections. The Master Plan Update SEIR is a program-level EIR, and is part of a tiered environmental review process, as allowed by CECA. The 1991 PEIR, 1997 SEIR, and 2004 SEIR function as the first tier of environmental analysis by establishing a resource database and assessing the anticipated environmental impacts from implementing the Master Plan. Subsequent second-tier environmental documentation (e.g., Categorical Exemptions, Negative Declarations, Mitigated Negative Declarations, or EIRs) will be prepared for specific projects, as required. All specific Master Plan projects will be subject to further CEQA review at a project-level analysis prior to their implementation. Project-specific MMRPs will be prepared for such projects, as appropriate. This 2004 SEIR is focused on those environmental topics for which new impacts might occur due to changes in baseline conditions, namely land use, biological resources, and cultural resources. However, the 2004 SEIR incorporates the 1991 PEIR by reference and, as such, this MMRP includes mitigation measures from the 1991 PEIR, 1997 SEIR, and 2004 SEIR, covering the full range of potential impacts. 1.2 Project Objective The District has experienced in the past, and is expected to experience in the future, a period of relatively rapid growth. Water demand and wastewater flows in existing service areas are expected to increase over the next 30 years as population increases and densification occurs. In addition, as new areas of the District develop, service areas for both water and wastewater Vallecitos Water District, Administrative Draft Master Plan SEIR f!1;\,w~;st:d.y';ilT1a;;la<pl;,n'.!lprl)n{j,,_b mmr\ll},14.i)~,do:; Page 1 Resolution No. 1248 Page 8 are expected to expand. The objective of the Water, Wastewater, and Water Reclamation Master Plan Update is to refine the existing Master Plan in order to meet projected demands in a feasible, efficient, and effective manner. The District is legally obligated to provide water and wastewater service within its service area (known as the will serve requirement). The Master Plan enables the District to plan for future demands and meet this requirement. The Master Plan Update provides a comprehensive assessment of capacity and demand for water, reclaimed water, and wastewater service, as summarized below, and recommends strategies for meeting the projected service demands. 1.3 Project Description Summary The District's 2002 Water, Wastewater, and Reclaimed Water Master Plan Update prOVides a comprehensive assessment of existing service capacities, projected demands, and recommended facilities for five-year and full development periods. It is based upon the 1991 Master Plan and 1997 Master Pian Update, with adjustments and modifications made for changes in projected demands. 1.3.1 Water The District currently operates 24 pressure zones within its water service boundaries. Of the 24 pressure zones, seven are considered pumped zones, as they require pump stations in order to transfer water from the source to the customer. The remaining 17 zones are gravity zones, in which water is supplied without the aid of pump stations. Overall, the District operates 7 pump stations, 21 pressure reducing stations, and 17 storage reservoirs. In addition, pipelines, ranging in diameter from 2 to 48 inches, connect the turnouts, pump stations, storage reservoirs, pressure reducing stations, and customers. The existing (2001) average, maximum week, maximum day, and peak hour water demands are 13.01 million gallons per day (mgd), 24.70 mgd, 27.30 mgd, and 41.60 mgd, respectively. The total five-year average demand is projected to increase to 15.94 mgd, an increase of approximately 17.3 percent over current demands. Water demands are projected to increase to a total of 21.36 mgd in 2020, an increase of 63.6 percent over current demands. Numerous five-year and full development improvements to the existing water system are identified in the 2002 Master Plan Update. These improvements primarily involve the construction or modification of transmission pipelines, pump stations, pressure reducing stations, and storage reservoirs. The 2002 Master Plan Update and Section 3 of the 2004 SEIR describe the recommended improvements for the five-year planning period and buildout. 1.3.2 Wastewater and Reclaimed Water The existing District wastewater system includes a series of interrelated collection, conveyance, and treatment facilities. These facilities include gravity sewers, force mains, and lift stations, as well as two treatment facilities: Meadowlark Water Reclamation Facility (MWRF) and Encina Water Poliution Control Facility (EWPCF). The MWRF is located just south of the City of San Marcos in the City of Carlsbad and the EWPCF is located in Carls bad between 1-5 and the Vallecitos Water District, Administrative Draft Master Plan SEIR' m:'''iP',:5b~..Jr,\llw;ti)lI'I''lllarpen'11'_b mrn~1 t)-14-il5.dCX: Page 2 Resolution No. 1248 Page 9 Pacific Ocean just south of Palomar Airport Road. The EWPCF is a regional facility that serves six member agencies, including the District. The District's existing water reclamation facilities consist of the MWRF, Mahr Reservoir, and a failsafe connection between the MWRF and EWPCF. Mahr Reservoir provides approximately 24 days of storage capacity (54 million gallons) based on the MWRF's 2.25 mgd capacity. Currently, the District wholesales reclaimed water to the City of Carlsbad for use in irrigation. The projected full development wastewater flows are 14.79 mgd, a decrease of 15 percent from the 1997 Master Plan Update projection of 17.5 mgd. This 15 percent decrease results from changing land uses within the District and the availability of more detailed land use information, which has enabled projections to be made more accurately. Proposed wastewater and reclaimed water projects contained in the 2002 Master Plan Update include gravity sewers, force mains, and lift stations. The 2002 Master Plan Update identifies a larger potential reclaimed water market than can be served with existing reclaimed water capacities. Projected users include golf courses, agricultural operations, parks, and other large landscaped areas. However, because the District has no plans to construct another water reclamation facility, the plan evaluated in the 2004 SEIR does not include a new plant and limits reclaimed water production to the capacity of the MWRF, which will be 5.0 mgd after its current expansion is completed. Expansion of the MWRF is being addressed in a separate Mitigated Negative Declaration. . 1.4 Guidelines for Project-Specific Mitigation Monitoring and Reporting Program In accordance with Section 21081.6 of CEQA, as amended by Assembly Bill (AB) 3180, the District is required to adopt an MMRP for monitoring and reporting all mitigation measures that are identified in EIRs or in Mitigated Negative Declarations prepared by the District. In order to monitor the implementation of mitigation measures identified in the EIRs, the District will first identify a Mitigation Compliance Coordinator (MCC) who will be responsible for overseeing the District's MMRP. This person will ensure and verify in writing that the recommended mitigation measures contained in the 1991 PEIR, 1997 SEIR, and 2004 SEIR are incorporated into project plans and associated CECA analysis and documentation for individual Master Plan projects. Mitigation measures thus far identified at the program level of detail are limited to recommendations for focused technical studies for subsequent projects and typical mitigation measures to be considered by the District in preparing project-specific CECA documentation. As such, mitigation monitoring for the Master Plan Update does not involve specific measures for field monitoring during and following project construction; the District would institute these specific measures in conjunction with project-specific MMRPs. Instead, the District will review future project development plans in light of the recommendations contained in the PEIR and SEIRs. The District will comply with this MMRP by completing all required technical studies based on project-specific development plans, incorporating mitigation recommendations contained in VaJ/ecitos Water District, Administrative Draft Master Plan SEIR :n""'1)\C.M<lr.~r.a;;Iil!r,I"nl<lppendl'tmlT\l1lt)..14,O,~_d6.-; Page 3 Resolution No. 1248 Page 10 these technical studies into project-specific CEQA documentation, and preparing and implementing mitigation monitoring activities for all Master Plan projects, as required by CECA. The District will develop and utilize a checklist to be placed in each project file to document compliance with the MMRP. In conjunction with either the Initial Study or Draft EIR for a project, the District will conduct studies in all technical areas where the potential for significant impacts exist (e.g., land use, biological resources, cultural resources, air quality, visual quality, noise, traffic/circulation, geology and soils, and hydrology/water quality). The studies will include mitigation measures to offset identified significant impacts, and these measures will include those measures contained in the respective technical sections of the PEIR and SEIRs. Project-specific MMRPs wili summarize the project description and the specific impacts and mitigation measures contained within the CECA documentation. The MMRP will also describe the specific planning activities, field monitoring, and reporting procedures that must be conducted by the District during project implementation, Typically, the District will identify a MCC to oversee the monitoring and reporting activities related to each project. The MCC will ensure that all identified mitigation measures are successfully implemented and that documentation verifying this implementation is prepared and filed with the District. The individual may be the same as the one selected to oversee the overall MMRP, or may be specific to an individual project. Vallecitos Water District, Administrative Draft Master Plan SEIR m:'\.';nk;Gbd\)C~n,)sW'rIM!,'IPp<:lndl,_b m'nrp 5-14-1J5dtx: ' Page 4 Resolution No. 1248 Page 11 Section 2: Mitigation Monitoring and Reporting Program This section outlines the MMRP for the Vallecitos Water District Water, Wastewater, and Water Reclamation Master Plan Update. 2.1 Master Plan Mitigation Monitoring and Reporting Program The 2002 Master Plan Update identified the need for new facilities and modifications that were not addressed in the 1991 Master Plan or the 1997 Master Plan Update. The 2004 SEIR maximizes the use of the 1991 PEIR and 1997 SEIR for those projects that remain unchanged and for presenting environmental considerations that have not changed since 1991 and/or 1997. The 2004 SEIR focuses primarily on the environmental impacts of new or modified projects, as reflected in the 2002 Master Plan Update. However, implementation of projects proposed in the 2002 Master Plan Update might differ from the assumptions of the 1991 PEIR and 1997 SEIR to the extent that some environmental baseline conditions might have changed since the documents were certified. Therefore, the 1997 SEIR and the 2004 SEIR are focused on the environmental topics for which new impacts might occur due to changes in baseline conditions. Potential impacts and mitigation measures were identified in the following resource areas: . Land Use . Biological Resources . Cultural Resources The 1991 PEIR identified potential impacts and mitigation measures in the following additional resource areas: . Air Cuality . Visual Resources . Noise . Traffic/Circulation . Geology/Soils . HydrologylWater Cuality 2.2 Mitigation Measures and Monitoring Strategies The following sections describe the mitigation measures from the PEIR and SEIRs and present the monitoring strategies to be employed in ensuring that the mitigation measures are implemented. Mitigation measures have been divided into two categories depending upon when they would be implemented: during design or construction. This determines how the mitigation measure will be monitored. A checklist for siting and design mitigation is included as Attachment A. Valleeitos Water District, Administrative Draft Master Plan SEIR 1l1:\WP~:l\bdOCiln,);;\f)lplan\1lppen!JI,.tlmm(p\J'.14.1)5dllr: Page 5 Resolution No. 1248 Page 12 2.2.1 Land Use 2.2.1.1 Summary of Impacts The 2002 Master Plan Update would not have a potentially significant impact on land use. Because of their short duration, no construction projects would cause significant short-term impacts to adjacent land uses. New pressure reducing stations, pump stations, lift stations, and reservoirs would have less than significant long-term land use impacts because they would be situated in areas compatible with existing and projected land uses; they would conform to applicable land use policies for local jurisdictions, including guidelines for community character and zoning; they would not divide any community or permanently preclude other future uses; and they would be generally small facilities that generate little to no noise or odors that would affect surrounding areas. New transmission pipelines and sewer mains would also have less than significant long-term impacts on land use because the pipelines would be installed below ground and would be located under existing streets so they would not affect adjacent land uses. 2.2.1.2 Mitigation Measures The following mitigation measures shall be implemented during siting and design: . Adequate buffers such as setbacks, berms, walls, and landscaping shall be incorporated into site design. . Projects shall be located in areas of compatible land use in order to avoid operational conflicts, such as noise, odors, and toxic materials. . Where possible, the siting of permanent aboveground facilities on important or prime agricultural lands shall be avoided. . Where possible, siting of permanent aboveground facilities on preserved agricultural lands or protected open space areas not planned for urbanization shall be avoided. . Unutilized graded areas in naturally vegetated locations shall be revegetated with native California plant species that provide habitat and are fire resistant, drought tolerant, and common to the area. ' . When possible, facilities shall be constructed immediately prior to development and shall be coordinated with the construction of related infrastructure improvement (e.g., roadways, electrical lines). No mitigation measures specific to construction have been identified for land use. Mitigation measures, such as those for air quality, noise, and traffic, that may also impact land use are described under those individual issue areas. 2.2.1.3 Mitigation Monitoring The MCC will be responsible for completing the Siting and Design Mitigation Checklist in Attachment A. The checklist will be incorporated into the CECA documentation prepared for the project. Valleeitos Water District, Administrative Draft Master Plan SEIR rr;\;'i:)',::Mi)G~r!a;;t;)frIHn\appe~jji, J: mrnip 1j..14.U5 doc Page 6 l Resolution No. 1248 Page 13 2.2.2 Biological Resources 2.2.2.1 Summary of Impacts Portions of the District contain significant biological resources that could be affected by implementation of the 2002 Master Plan Update, and significant impacts could occur. Specific resource values include sensitive riparian, marsh, sage scrub, and oak woodland habitats, as well as a number of rare floral and faunal species. All potential impacts to these resources will be addressed during site-specific review of individual projects. General mitigation measures are provided in this SEIR with detailed mitigation to be provided after site-specific review. In addition to potentially significant biological resource impacts, the Master Plan has the potential to cause potentially significant cumulative impacts in conjunction with past, present, and future projects in and around the District service area. To reduce those impacts to less than significant levels, it is assumed that the mitigation measures described would be implemented for these cumulative projects. The District does not have the jurisdiction or responsibility to implement these mitigation measures for non-District projects. The mitigation measures would be implemented by the project proponent and monitoring would be required as directed by the appropriate responsible agencies. 2.2.2.2 Mitigation Measures The following mitigation measures shall be implemented during siting and design: . While designing projects and during construction of a project, existing roadways, pipelines, and other disturbed rights-of-way shall be utilized to the maximum extent feasible. . . Biological surveys shall be conducted in detail prior to implementation of individual projects that have potentially significant impacts on native vegetation, wildlife habitats, or any sensitive plant or animal species. The purpose of the surveys is to confirm the presence or absence of sensitive species, determine the potential for significant impacts on native vegetation, wildlife habitats, or any sensitive plant or animai species, and to identify specific mitigation measures, as appropriate, for the potentially impacted resource. All surveys shall be conducted by a qualified biologist holding an appropriate Recovery Permit from the U.S. Fish and Wildlife Service (USFWS). All surveys shall be conducted at the times designated in the survey protocols and under suitable weather conditions. Surveys for rare and narrow endemic plants shall be conducted during the appropriate season to determine the presence or absence of these species. Specific survey protocols listed below shall be used if suitable habitat is found for the following species: California gnatcatcher: Three surveys, a minimum of one week apart. Least bell's vireo: Eight surveys, ten days apart during the breeding season (approximately March 15 until July 1). Southwestern willow flycatcher: Three surveys (Survey 1 between May 15 and 31; Survey 2 between June 1 and 21, Survey 3 between June 22 and July 10). Vallecitos Water District, Administrative Draft Master Plan SEIR m:\W).i',:5N.v.;'~rta';li)lpl"n\E~pen.:lI'.b mmfJl tJ..14.05 ct.x. Page 7 Resolution No. 1248 Page 14 Successive surveys must be at least five days apart. Arroyo toad: At least six surveys during the breeding season (March 15 through July 1), with at least seven days between surveys. At least one survey shall be conducted during April, May, and June, with both daytime and nighttime components during the same 24-hour period. Quino checkerspot butterfly: not required at this time. If it is determined in the future that the butterfly's distribution has changed and surveys are warranted, one survey would be conducted during each week of the flight season, as determined by the USFWS. . Any projects proposed within or adjacent to any preserve areas designated in the North County draft and adopted subarea plans shall incorporate adjacency guidelines to minimize the project's potential impacts from increased noise, light, drainage, invasive species, and human intrusion. . Siting review conducted during the early stages of design shall include input from a qualified biologist in order to avoid known areas of sensitive species, plant communities, or wildlife habitats to the maximum extent possible. The following mitigation measures would be implemented during construction: . Construction activities and disturbance shall be avoided in bird nesting habitats during the nesting season. . Topsoil shall be salvaged when trenching is conducted in vegetated areas and shall be replaced on top of excavated material, as required. . Native plant materials shall be used for revegetation that are appropriate for the native habitat. The revegetation should reflect as nearly as possible the species makeup of the disturbed or surrounding vegetation, with modifications made by a qualified biologist for drought tolerance, flammability, or other concerns. All revegetation plans shall incorporate a 5-year monitoring and maintenance program. Mitigation measures specific to individual vegetation or habitat types are listed below. . Chaparral: Impacts to mafic mixed chaparral, mafic chamise chaparral, or to southern maritime chaparral shall be avoided to the maximum extent feasible. Where impacts cannot be avoided, mitigation shall be provided at a ratio .of 1: 1 to 3: 1, and may include on-site preservation or off-site habitat acquisition. Off-site mitigation should be within a designated preserve area or a designated mitigation bank accepted by the resource agencies. Impacts to mixed chaparral and chamise chaparral shall be mitigated at a ratio of 0.5: 1 to 1: 1 either on- or off-site. Vallecitos Water District, Administrative Draft Master Plan SEIR ni!wP~::,bd'l'l:lm;'l,>trn~l:m"3"pIlMI._b rr;n!\) ,). 14.0~.:}:x; Page 8 Resolution No. 1248 Page 15 . Coastal Sage Scrub: Impacts to undisturbed sage scrub vegetation shall be avoided to the maximum extent feasible. Mitigation shall be provided at a ratio ranging from 1: 1 to 2: 1, either on- or off-site. Where there will be a loss of coastal sage scrub in an area not currently covered under an approved, adopted subarea plan, a Habitat Loss Permit (HLP) will be required under Interim Rule 4d of the Endangered Species Act (ESA). Interim Rule 4d allows for the loss of 5 percent of a given jurisdiction's total coastal sage scrub habitat, provided the loss is mitigated. For losses of coastal sage scrub under 1 acre and not occupied by California Gnatcatchers, "de minim us" findings can be made with the approval of the USFWS and California Department of Fish and Game (CDFG). Any temporarily disturbed area shall be re-seeded with a seed mix that will reflect, as nearly as possible, the species makeup of the original vegetation. If feasible, native seed from the site should be collected prior to clearing and grubbing. California Gnatcatcher populations shall be avoided to the maximum extent possible. . Riparian Habitats (including freshwater marsh and oak woodlands): Wetland delineations and jurisdictional determinations shall be conducted, as required, to identify the areas that are under the jurisdiction of the U.S. Army Corps of Engineers (Section 404 of the Clean Water Act) andlor CDFG (Section 1600 et seq. of the California Fish and Game Code), and the County's Resource Protection Ordinance (RPO). All riparian habitats shall be avoided to the maximum extent practicable. If impacts cannot be avoided, mitigation shall be required at a ratio ranging from 1:1 to 3:1 to achieve a no-net-Ioss of habitat, and shall involve a habitat creation component. In accordance with CDFG guidelines, mitigation plans for wetland habitat restoration. will be developed. This will include a 5-year monitoring and maintenance program. Habitats that are suitable or occupied by sensitive riparian birds such as Least Bell's Vireo or others shall be avoided when appropriate. Construction through oak woodlands will be avoided as much as possible. Fifty- foot buffers will be maintained between oak woodland drip lines and construction activity. The drip line represents the outermost reaches of the oak woodland canopy. Pruning shall be performed prior to construction activity if low branches could potentially be damaged during construction. If roots are disturbed, cuts will be cleanly trimmed immediately and painted with an approved sealant. Vallecitos Water District, Administrative Draft Master Plan SEIR ",::",vulXloemaste;rL'm\af'pendl..t,mllUfJ!J..14.05.dc<: Page 9 \ Resolution No. 1248 Page 16 . Vernal Pools: Direct impacts to vernal pools shall be avoided to the maximum extent feasible. All indirect impacts to vernal pOOls and their watersheds (e.g., manipulation of the natural drainage systems in the vicinity of the pools) shall also be avoided. Any impacts to vernal pools will require mitigation at a 3:1 ratio and would require habitat creation to achieve a no-net-Ioss of vernal pool habitat. Sensitive areas, including the pool watershed, shall be fenced to prohibit damage from construction machinery or personnel if vernal pools occur in the vicinity of construction. . Perennial Grasslands: Impacts to native grasslands shall be avoided to the extent practicable. Impacts to these habitats shall require mitigation at a ratio ranging from1:1 to 3:1, either on- or off-site. Construction shall be limited to the summer season when the Nasella grasses are in a dormant stage. . Annual Grasslands: Impacts to annual grasslands shall be mitigated at a 0.5:1 ratio, either on- or off- site. 2.2.2.3 Mitigation Monitoring A qualified biologist will perform further review of the site and will provide detailed site-specific mitigation recommendations and the MCC will be responsible for completing the Siting and Design Mitigation Checklist in Appendix A. The checklist will be incorporated into the CEQA documentation prepared for the project. Prior to final design and implementation of individual Master Plan projects that affect biological resources, a qualified biologist shall conduct a site-specific analysis. The above mitigation measures shall be incorporated into all contract specifications, as appropriate. The MCC shall verify that the mitigation measures are incorporated into the project design prior to the start of construction. The MCC shall inspect the construction site on a weekly basis, or as otherwise appropriate, to ensure that mitigation measures designed to preclude or reduce impacts on biological resources are being followed. 2.2.3 Cultural Resources 2.2.3.1 Summary of Impacts The 2002 Master Plan Update includes projects that involve ground disturbance in areas that may contain previously unrecorded archaeological and historic resources. These projects have the potential to cause significant impacts to cultural resources. Site-specific surveys and Valfecitos Water District, Administrative Draft Master Plan SEIR r;:.',i;:;\('5M")I:'~n'l;;t,)lpl:ln''''rp~~ill' J' mn'lI1J .j, I 4, OS,doc: Page 10 Resolution No. 1248 Page 17 testing, if necessary, must be conducted for all Master Plan projects. Mitigation can typically be accomplished through site avoidance, data recovery, and monitoring. In addition to potentially significant cultural resource impacts, the Master Plan has the potential to cause potentially significant cumulative impacts in conjunction with past, present, and future projects in and around the District service area. To r_educe those impacts to less than significant levels, it is assumed that the mitigation measures described would be implemented for these cumulative projects. The District does not have the jurisdiction or responsibility to implement these mitigation measures for non-District projects. The mitigation measures would be implemented by the project proponent and monitoring would be required as directed by the appropriate responsible agencies. 2.2.3.2 Mitigation Measures The following mitigation measures shall be implemented during siting and design if the project would be located in previously undisturbed areas: . A cultural survey for known nearby cultural sites shall be conducted. This information shall be used for preliminary planning for placement of new facilities such as mains, reservoirs, and pump stations in order to avoid known sites, where feasible. Cultural resource surveys and evaluations on a project-specific basis shall be required for Master Plan facilities that are not sited on graded building pads or roadways placed in bedrock cuts. These surveys shall be conducted by a qualified professional archaeologist. As necessary and appropriate for the nature of cultural resources known to be present, these surveys and evaluations shall include the following: . Walkover survey of the facility location and ancillary facilities. . Identification and recording of any cultural resources. . Consultation with the Native American Heritage Commission and appropriate tribal representatives for important Native American sites, including, but not limited to, ceremonial, religious, or burial sites. . Limited testing of each cultural resource, as necessary, to determine its extent, the content of the site, and the significance of the site under Appendix K of CEQA. . Preparation of a report that details the survey methodology and findings, a description of any historic and prehistoric cultural resources, recommendations to determine the significance of the resource, an evaluation of the resource significance, and recommended mitigation measures. . During the project siting process, sensitive cultural resource sites shall be avoided. This can be accomplished by such measures as rerouting a pipeline or siting a structure, such as a pump station or aboveground reservoir, in a manner that excludes the site from the area of direct impact. . Cultural resources studies for projects that affect Native American resources shall also include consultation with the Native American community to determine the cultural Val/ecitos Water District, Administrative Draft Master Plan SEIR r.i:',>\'j)\r;sl:::lx~il..<;t')p!:m'alI'tXI'.P mmrp 5-14.0!',dx Page 11 Resolution No. 1248 Page 18 heritage value of sites separate from their archaeological significance. For these projects, the Native American community shall be involved in the planning process during the early stages, so that potential concerns can be adequately addressed. The following mitigation measures shall be implemented during construction if the project would be located in previously undisturbed areas: . If avoidance is not feasible, mitigation of impacts shall be achieved through development and implementation of a data recovery excavation program, guided by a research design. Data recovery programs shall include cataloging and analysis of recovered cultural material, a comprehensive report of the methods and results of the data recovery excavation, and curation of recovered cultural material at an appropriate repository, such as the San Diego Archaeological Center. . Preservation measures can be implemented to protect the resources from direct project- related impacts or from indirect impacts. This can include placing an archaeological site in a fenced area or setting it aside from future studies by placing it in an open space easement. In some cases, sites can be preserved through capping of significant deposits so that they would not be disturbed by construction. Often, buildings can be reused and incorporated into facility design. . 2.2.3.3 Mitigation Monitoring Prior to final design and implementation of individual Master Plan projects, a qualified archaeologist shall conduct a site-specific analysis of cultural resources, if appropriate. The mitigation measures suggested by this study shall be incorporated into all contract specifications, as appropriate. The MCC shall verify that the mitigation measures are incorporated into the project design prior to the start of construction. The MCC shall inspect the construction site on a weekly basis, or as otherwise appropriate, to ensure that mitigation measures designed to preclude or reduce impacts to cultural resources are being followed. 2.2.4 Air Quality 2.2.4.1 Summary of Impacts The San Diego Air Basin (SDAB) as a whole is considered for the evaluation of cumulative air quality impacts. Because the SDAB is a non-attainment area for ozone and PM10, the incremental increase in air pollutants contributed by the 2002 Master Plan Update would be a significant cumulative impact. Mitigation measures involve the San Diego Air Pollution Control District's (APCD's) implementation of regulatory standards to achieve basin-wide attainment of air quality objectives. Because these measures would not eliminate emissions of ozone or particulates in a region designated nonattainment for these pollutants, the incremental effect of the 2002 Master Plan Update in combination with other listed projects could be cumulatively considerable, and cumulative impacts to air quality would be significant. In addition to potentially significant air quality impacts, the Master Plan has the potential to cause potentially significant cumulative impacts in conjunction with past, present, and future projects in and around the District service area. To reduce those impacts to less than significant Val/ecitos Water District, Administrative Draft Master Plan SEIR in:\I'l1\',;sb,:fm:~ili;tmpl\lr.\;wp~Mi,.b mrr'l) i;.I~,05,1o(; Page 12 Resolution No. 1248 Page 19 levels, it is assumed that the mitigation measures described would be implemented for these cumulative projects. The District does not have the jurisdiction or responsibility to implement these mitigation measures for non-District projects. The mitigation measures would be implemented by the project proponent and monitoring would be required as directed by the appropriate responsible agencies. 2.2.4.2 Mitigation Measures The following mitigation measures shall be implemented during construction: . Adequate water and/or other dust palliatives shall be used on disturbed areas. . Street washing and/or sweeping shall be employed along access roads to remove soil carried from the site to the street and prevent vehicles from pulverizing soil into tine particles. . Soil excavation, clearing, or grading shall be terminated when wind speeds exceed an hourly average of 25 mph. . All vehicles hauling soil on publiC roadways shall be covered or tarped to prevent airborne dust generation. . Bonding shall be required to ensure proper operational performance with respect to air quality under penalty of forfeiture. . Low NOx emission tune-ups shall be required for all on-site construction equipment at a minimum interval of every 90 days. . Rideshare or transit incentives shall be provided for construction personnel. . Obstruction of through traffic lanes from construction equipment or activities shall be minimized. . Engine idling shall be prohibited while waiting to load or unload if the expected wait time exceeds 10 minutes. . Operations affecting roadways shall be scheduled during off-peak traffic hours. 2.2.4.3 Mitigation Monitoring Following the completion of a site-specific air quality evaluation, the above mitigation measures will be incorporated into the contract specifications, as appropriate. The MCC or a qualified air quality specialist will inspect the site on a regular basis to determine if the air quality mitigation measures are being followed and are effective. . Vallecitos Water District, Administrative Draft Master Plan SEIR rr!'\''ip\f.5~dOl;\111,)!;lt')lpl:ln\;)PI''(>n;II,:J,mmrptl,.14,O!idor. Page 13 Resolution No. 1248 Page 20 2.2.5 Visual Quality 2.2.5.1 Summary of Impacts The Master Plan could potentially result in significant impacts related to visual resources. It is expected that design and mitigation measures could reduce these impacts below levels of significance, although this assumption will require verification during site-specific CECA review. The Master Plan has the potential to cause potentially significant cumulative visual quality impacts in conjunction with past, present, and future projects in and around the District service area. To reduce those impacts to less than significant levels, it is assumed that the mitigation measures described would be implemented for these cumulative projects. The District does not have the jurisdiction or responsibility to implement these mitigation measures for non-District projects. The mitigation measures would be implemented by the project proponent and monitoring would be required as directed by the appropriate responsible agencies. 2.2.5.2 Mitigation Measures The following mitigation measures shall be implemented during siting and design: . Prior to the implementation of Master Plan projects, a site-specific review of visual resource impacts shall be conducted. Standard mitigation measures, such as landscaping, visual screening, and height restrictions, will be incorporated into project design and implementation. 2.2.5.3 Mitigation Monitoring Should the site-specific visual quality evaluation indicate that it is necessary, the District will hire a revegetation specialist or registered landscape architect to develop and implement a landscape plan. The revegetation specialist or landscape architect will be responsible for monitoring the successful implementation of the landscape plan. The MCC is responsible for coordination with the revegetation specialist or the registered landscape architect in the preparation of a suitable landscaping plan. The MCC will examine project design plans prior to the start of construction to ensure that aboveground facilities will be landscaped andlor enclosed, as required. The MCC will inspect the site after construction is completed to ensure that those plans were carried out. One year after the construction of the project is completed, the MCC will Inspect the site to determine the success of the landscaping. 2.2.6 Noise 2.2.6.1 Summary of Impacts Implementation of the Master Plan will result in construction and operation-related Impacts. Mitigation measures consist of time constraints and distance buffers to maintain acceptable levels of noise exposure. It is anticipated that all noise impacts will be reduced to below a level of significance, although this assumption will require verification during site-specific CECA review. Vallecitos Water District, Administrative Draft Master Plan SEIR '!i:';~Vc,l>ar~na5til1p,a~\ilt'pefl~I' ._b rronrp iJ.14.C5.:b;; Page 14 Resolution No. 1248 Page 21 In addition to potentially significant noise impacts, the Master Plan has the potential to cause potentially significant cumulative impacts in conjunction with past, present, and future projects in and around the District service area. To reduce those impacts to less than significant levels, it is assumed that the mitigation measures described would be implemented for these cumulative projects. The District does not have the jurisdiction or responsibility to implement these mitigation measures for non-District projects. The mitigation measures would be implemented by the project proponent and monitoring would be required as directed by the appropriate responsible agencies. 2.2.6.2 Mitigation Measures The following mitigation measures shall be implemented during siting and design: . A site-specific evaluation by a qualified noise specialist of potential noise impacts shall be required for individual projects. Depending on the nature, location, and design of specific projects, a number of mitigation measures may be recommended. . Pump stations shall be enclosed within block wall structures, pursuant to direction by a qualified noise specialist. If siting within 100 feet of residential structures is unavoidable, analysis shall be performed to ensure that noise levels conform to the appropriate regulatory guidelines at any affected residence. The following mitigation measures shall be implemented during construction: . Mobile equipment shall not be operated within 50 feet of any residence. . Partly mobile or stationary equipment shall not be operated within 100 feet during the day or 300 feet at night of any residence, unless appropriate noise buffers (e.g., berms or walls) are utilized to shield line-of-sight propagation (pursuant to direction by a qualified noise specialist). 2.2.6.3 Mitigation Monitoring The MCC will be responsible for completing the Siting and Design Mitigation Checklist in Attachment A. The checklist will be incorporated into the CECA documentation prepared for the project. Following completion of an acoustical investigation by a qualified noise specialist, the appropriate recommendations shall be incorporated into the construction and operation of a project. The MCC will ensure that these recommendations are incorporated into the construction operating procedures before construction begins. The MCC or noise specialist will make weekly, or as otherwise necessary, inspections of the project site to ensure that the recommended measures are being implemented. The noise specialist will report hislher findings to the MCC on a monthly basis or as otherwise appropriate. Area residents potentially impacted by project noise will be informed of the hours of construction and the name and telephone number of a contact person to whom they may lodge complaints. The MCC will be responsible for investigating complaints received, or dispatching a qualified noise specialist to investigate any complaints. Vallecitos Water District, Administrative Draft Master Plan SEIR ,~::'"!'v~:~ll,jD::',M,,t>Jl pI:JIl\t,pperhli, .,b MIl'll)) e., i4.1l5.d,ll; Page 15 Resolution No. 1248 Page 22 2.2.7 Traffic/Circulation 2.2.7.1 Summary of Impacts Potential traffic impacts associated with the proposed Master Plan are limited to short-term construction effects, that are not considered significant. This conclusion would be subject to verification, however, during site-specific environmental review. In addition, work restrictions are recommended during peak periods to reduce effects on local traffic flows. In addition to potentially significant traffic/circulation impacts, the Master Plan has the potential to cause potentially significant cumulative impacts in conjunction with past, present, and future projects in and around the District service area. To reduce those impacts to less than significant levels, it is assumed that the mitigation measures described would be implemented for these cumulative projects. The District does not have the jurisdiction or responsibility to implement these mitigation measures for non-District projects. The mitigation measures would be implemented by the project proponent and monitoring would be required as directed by the appropriate responsible agencies. 2.2.7.2 Mitigation Measures The following mitigation measures shall be implemented during siting and design: . Project-specific traffic evaluations shall be conducted for individual Master Plan facilities prior to project implementation. All design and mitigation measures recommended in the evaluation shall be incorporated into final project design and/or construction specifications, as appropriate. The following mitigation measures shall be implemented during construction: . Construction activities shall be scheduled during non-peak hours as much as possible in order to avoid congestion. Peak hours are generally defined as the periods between 7 a.m. and 9 a.m., and 4 p.m. and 6 p.m. . Construction activities shall be conducted so as to maintain through traffic and local access and parking pursuant to the requirements of local regulatory jurisdictions. . Traffic safety shall be maintained through the use of specific construction traffic routes, crossing points, speed limits, flag people, and warning devices pursuant to the requirements of local regulatory jurisdictions. 2.2.7.3 Mitigation Monitoring The MCC will be responsible for completing the Siting and Design Mitigation Checklist in Attachment A. The checklist will be incorporated into the CEQA documentation prepared for the project. During construction, the MCC will conduct periodic site inspections .to ensure that the recommended mitigation measures are being enforced. It should be noted that the combined Vallecitos Water District, Administrative Draft Master Plan SE/R m:;'\1i";G~:1\ll:'una~\i)r plap,\app~n!Jr, ,b mil'lrl! j)..14.0S.<Joc Page 16 Resolution No. 1248 Page 23 intent of the noise and traffic mitigation is to minimize truck traffic associated with individual projects from the local roadways before 9 a.m. 2.2.8 Geology and Soils 2.2.8.1 Summary of Impacts The Master Plan facilities have the potential to cause impacts to, or be affected by, geologic resources. Issues include the loss of Prime Farmland, seismic hazards, soil instability, shallow bedrock and groundwater, and the disposal of excess or oversize material. All potential impacts must be addressed during site-specific project review. Numerous mitigation measures are recommended in 1991 PEIR to avoid impacts or reduce them below levels of significance. In addition to potentially significant geology and soils impacts, the Master Plan has the potential to cause potentially significant cumulative impacts in conjunction with past, present, and future projects in and around the District service area. To reduce those impacts to less than significant levels, it is assumed that the mitigation measures described would be implemented for these cumulative projects. The District does not have the jurisdiction or responsibility to implement these mitigation measures for non-District projects. The mitigation measures would be implemented by the project proponent and monitoring would be required as directed by the appropriate responsible agencies. 2.2.8.2 Mitigation Measures The following mitigation measures shall be implemented during siting and design: . Detailed geotechnical investigations shall be conducted by a qualified geologist prior to implementation of the proposed Master Plan projects. These investigations shall include evaluation of the geologic and seismic environment, including potential effects associated with liquefaction, ground acceleration, landsliding, seiches, expansive and reactive soils, compaction, erosion, and final project design, including all measures identified to reduce or preclude impacts. . Landscape plans shall be prepared for appropriate areas pursuant to direction by a qualified botanist or landscape architect. These plans shall utilize native drought- tolerant vegetation to the maximum extent feasible, and shall be implemented as soon as possible after completion of grading operations to reduce potential erosion effects. . All slope designs, cuts, fills, erosion control, surface and subsurface drainage, and foundation and retaining wall design shall conform to the recommendations of a qualified geologist. . Material disposal methods, locations, and haul routes shall be designated as part of specific project design, and shall include coordination with, and approval by, appropriate regulatory agencies. . Appropriate grading and construction measures shall be utilized to accommodate seismic loading, pursuant to direction by a qualified geologist. Val/eeitos Water District, Administrative Draft Master Plan SEIR "1::wp~;"l;.drX;~T;a;;lm ~IHn\appeniJI'J~ fl1mlll f}. 14. f)S d..., Page 17 Resolution No. 1248 Page 24 · Proposed design, grading, and construction activities shall conform to pertinent requirements of the Uniform Building Code, California Division of Dam Safety, and local ordinances, where appropriate. . Grading plans shall be reviewed prior to finalization to determine the need for additional comments, recommendation, and/or analysis pursuant to direction by a qualified geologist. The following mitigation measures shall be implemented during construction: . Unsuitable base materials shall be excavated and replaced with approved and properly compacted structural fill. Unsuitable base materials may include deposits subject to liquefaction, expansion, differential or excessive compaction and reactivity. . Appropriate measures shall be used to control expansive soils (e.g., moisture control or addition of chemical stabilizers) or reactive soils (e.g., use of corrosion-resistant steel and concrete) in areas where complete removal is impractical. . Erosion-controlling and slope stabilization measures shall be employed both during and after completion of construction activities. These may include methods such as revegetation, detention structures, retaining walls, temporary siopes or buttressing, brow ditches, and work restrictions during inclement weather. . Compacted areas shall be treated (e.g., by scarification) to facilitate revegetation and reduce erosion potential. . Surficial materials, including alluvium, fill, and topsoils, shall be excavated to firm natural ground and either replaced with approved fill or recompacted, depending on direction from a qualified geologist. . All fill materials used for proposed grading and construction activities shail meet the specification of a qualified geologist in terms of composition, size distribution, moisture content, compaction, depth, and application methodology. . The use and/or disposal of oversize rock material shall be in accordance with direction by a qualified geologist. Generally, this would entail methods such as offsite disposal, placement in deeper on-site fills, crushing, or use in landscaping efforts of ail rock exceeding approximately 24 inches in diameter. . Ail areas to be paved shail incorporate subsurface materials that meet the composition and compacting requirements of a qualified geologist. This wiil likely involve 90 percent relative compaction to a minimum depth of 12 inches and the use of granular non- expansive fiil. . Cut and fill transition zones associated with overlying structures shall be designed pursuant to direction by a qualified geologist. . All cut slopes and trenches shall be observed during grading pursuant to direction by a qualified geologist to ensure conformity with anticipated subsurface conditions. Val/eeitos Water District, Administrative Draft Master Plan SEIR Page 18 .1!:\Wl)\(:;;t:d')c'.11~,tllpl:m\:]ppenci; _D rJ\!l1m 6-.14-05.d,'1(: Resolution No. 1248 Page 25 · Inspections and testing of all grading materials and procedures shall be conducted as directed by a qualified geologist. . All drainage facilities owned and maintained by the District shall be regularly inspected and properly maintained to ensure proper working order. · If explosives are necessary for excavation activities, their use shall conform to all appropriate state and local guidelines. These would include measures to safeguard explosives in approved storage facilities, ensure safe operation and handling by trained personnel, and protect sensitive receptors (if any) from potential noise and vibration effects, . Disposal of groundwater from dewatering operations shall be coordinated with the RWQCB. 2.2.8.3 Mitigation Monitoring The District will hire a qualified geologist to oversee/perform the necessary analysis of the chosen site. The MCC and the qualified geologist will review project design plans prior to the start of construction to confirm that potential impacts from geotechnical constraints have been sufficiently mitigated. Throughout the course of construction, the MCC will periodically monitor construction to verify that design measures intended to mitigate geology/soils constraints are being implemented. The MCC may require that the qualified geologist perform site inspections during construction to assist the MCC in confirming the implementation of geotechnical mitigation measures. 2.2.9 Hydrology/Water Quality 2.2.9.1 Summary of Impacts The Master Plan has the potential to cause significant impacts in the areas of surface water quality during construction as a result of erosion, increased runoff, flooding and leaks or spills from transmission or storage facilities. Shallow groundwater can present a problem during construction and the use of groundwater could cause the overdrafting of aquifers. The application of reclaimed water for irrigation also has both surface and groundwater quality implications. Numerous technical and other environmental studies must be conducted prior to implementation of Master Plan projects. Mitigation measures are recommended in the 1991 PEIR to avoid impacts or reduce them below levels of significance. In addition to potentially significant hydrology/water quality impacts, the Master Plan has the potential to cause potentially significant cumulative impacts in conjunction with past, present, and future projects in and around the District service area. To reduce those impacts to less than significant levels, it is assumed that the mitigation measures described would be implemented for these cumulative projects. The District does not have the jurisdiction or responsibility to implement these mitigation measures for non-District projects. The mitigation measures would be implemented by the project proponent and monitoring would be required as directed by the appropriate responsible agencies. Vallecitos Water District, Administrative Draft Master Plan SE/R m:\~'liV.:r,b0;~na;:lm r!,lI\\~rpeO!li, . b mmrp G.- 14.05.00.:: Page 19 Resolution No. 1248 Page 26 2.2.9.2 Mitigation Measures The following mitigation measures shall be implemented during siting and design: . Detailed hydrologic analyses shall be conducted by a qualified hydrologist and/or civil engineer prior to implementation of proposed Master Plan actions. Such investigation shall include evaluation of the surface hydrological environment to determine site- specific effects related to runoff volumes and velocities, flooding (both on- and off-site), drainage alteration, and erosion. The results of these investigations would be used in the development of final project design, including all measures identified to reduce' or preclude impacts. . Drainage design shall be coordinated with local engineering and/or flood control departments, where appropriate. . Surface drainages shall be designed to collect and move runoff into appropriate drainage courses or structures. This would involve preserving existing drainage patterns to the maximum extent feasible and utilizing appropriate improvements (crossing structures, etc.) to maintain existing flow volumes and velocities. . The design and placement of subdrains under all fills located in drainage courses shall be conducted in accordance with the direction of the hydrologist and/or civil engineer. . All project-related facilities shall be designed to accommodate projected 100-year storm fiows. . . All facilities subject to flooding damage shall be located outside of mapped 100-year floodplains, or protected per direction of the project civil engineers, geologists, and hydrologists. Protective measures may include berms, dikes, reinforcing materials, or elevation above mapped flood elevations. . Pervious materials shall be used for access roads, parking areas, etc. wherever feasible, to increase infiltration and decrease surface runoff. . Detailed design analysis for major water transmission or storage facilities shall include contingency plans regarding potential spills or leaks and associated flooding and erosion hazards. Where appropriate, this shall include the submission of facility design data to the California Division of Safety of Dams for review and approval. . Short- and long-term erosion control measures shall be implemented as appropriate to preclude significant surface water quality degradation. Such measures would be determined by qualified hydrologists, civil engineers and/or landscape architects, with typical methods outlined above in this section under surface water. The fOllowing mitigation measures shall be implemented during construction: . All District owned and maintained drainages and erosion control facilities shall be regularly maintained to ensure proper working condition. Valleeitos Water District, Administrative Draft Master Plan SEIR Page 20 rr::\~'V\"(;b(!ilr;\;,,,~;:teli"I"~~rp...n(J!ii Jl mmrp t).. 14.0r,.doe:; Resolution No. 1248 Page 27 · Blockage and damage of graded berms, swales, area drains, and slopes shall be avoided. . Water ponding in roadways and runoff down graded or natural slopes shall be eliminated. . Sandbags, hay bales, mulches, matting, or similar devices shall be used along all graded roadways, slopes, and pads to minimize sediment transport in the short term. The exact nature and location of such facilities shall be determined by a hydrologist or civil engineer. . All graded slopes shall be temporarily hydroseeded to provide interim stability. . Native vegetation shall be preserved, wherever feasible, and all disturbed areas shall be reclaimed as soon as possible after the completion of grading. . Where appropriate, runoff devices (e.g., inlet pipes and brow ditches) shall be used to preclude runoff from graded slopes. . Energy dissipating structures (e.g., detention ponds, drop structures, or riprap blankets) shall be used downstream of all culverts, storm drains, and brow ditches to reduce velocity and prevent erosion. . Pre-development runoff volumes shall be preserved to the maximum extent feasible and detention or energy-dissipation structures shall be used to prevent damage to downstream drainage facilities and improvements. . Grading and other surface-disturbing activities shall be restricted during inclement weather. . Appropriate compacted areas shall be scarified to induce runoff infiltration and revegetation. . Removal and disposal of groundwater (if any) encountered during construction activities shall be coordinated with the local RWCCB to ensure proper disposal methods and locations. 2.2.9.3 Mitigation Monitoring Prior to the final design and implementation, a qualified hydrologist or civil engineer shall conduct an analysis of hydrology and water quality. The mitigation measures suggested by this study shall be incorporated into the contract specifications, as appropriate. The MCC shall verify that the mitigation measures are incorporated into the project design prior to the start of construction. The MCC shall inspect the construction site on a weekly basis, or as otherwise appropriate, to ensure that mitigation measures designed to preclude or reduce water quality impacts are being followed, including the provision that potentially hazardous materials are properly disposed. Val/eeitos Water District, Administrative Draft MasterPlan SEIR IH:\'\l:'a,lx1l)c\ma~~)!i'I..~'''''r,pl:~,dl' .,b Il'llnnl ij..14. %di)(~ Page 21