Loading...
Reso 0209-11/1963 RESOLUTION NO. 209 RESOLUTION OF THE BOARD OF DIRECTORS OF THE SAN MARCOS COUNTY WATER DISTRICT ESTABLISHING POLICY FOR PROPOSED SUBDIVISION PROCEDURE REGARDING WATER AND/OR SEWER SYSTEM AND PARPICULAR AGREEMENT FOR CONSTRUCTION OF SAME WITH SUBDIVIDER. BE IT RESOLVED by the Board of Directors of the San Marcos County Water District as follows: WHEREAS, the Board of Directors of the San Marcos County Water District has determined that proper chronological prodedure be established for proposed subdivision development regarding water and/or sewer system, and WHEREAS, the Board of Directors of the San Marcos County Water District has determined the necessity fer proper construction agreement for development of water and/or sewer system within proposed subdivision development. NOW, THEREFORE BE IT RESOLVED that policy shall be as follows: 1. Upon receipt of one print of Tentative Map, District will write letter to Real-Estate Commissioner and County Health Department stating the conditions of service. 2. Upon submittal of three prints of the Tentative Map, together with a deposit to cover the estimated cost of engineering for hydraulic analysis and schematic system layout, the District will determine the sizes and locations of sewers, mains, valves, and hydrants required. One print of the Tentative Map showing these facilities schematically will be returned to the Developer or his Engineer by the District's Engineer. The system shown is subject to approval by the Directors. 3. District's Engineer will submit a print of the Tentative Map showing system layout to the Directors with reco- mmendation for approval. Notification of approval or disapproval will be mailed to Developer or his Engineer. 4. Developer's Engineer prepares construction plans and submits one set of prints to District's Engineer for checking and approval. 5. Following approval of the construction plans, the Developer shall enter into an Agreement with the District providing for the construction of the systems to the District standards, and also providing for the acceptance of the completed systems by the District. Developer shall not commence construction until the Agreement has been approved and executed by the District. If a RESOLUTION NO. 209 Page 2 commitment is required of the District as to water or sewerage service, or if any portion of the District's existing system is to be modified, a bond is required. PASSED, ADOPTED AND APPROVED this 18th day of November 1963, by the following polled vote: AYES: Directors: Blanchard, Mahr, Paul, Smith and Truesell NOES: Directors: None ABSENT: Directors None Oby Blanchard, President of the Board of Directors and the San Marcos County Water District Jeanne M. Gist, Secretary of the San Marcos County Water District and Board of Directors thereof RESOLUTION NO. 209 RESOLUTION OF THE BOARD OF DIRECTORS OF THE SAN MAR COS COUNTY WATE~ DISTRICT ESTABLISHING POLICY FOR PROPOSED SUBDIVISION PROCEDURE REGARDING WATER AND/OR SEWER SYSTEM AND PARTICULAR AGREEMENT FOR CONSTRUCTION OF SAME WITH SUBDIVIDER BE IT RESOLVED by the Board of Directors of the San Marcos County Water District as follows: WHEREAS, the Board of Directors of the San Marcos County Water District has determined that proper chronological procedure be established for proposed subdivi- sion development regarding water and/or sewer system, and WHEREAS, the Board of Directors of the San Marcos County Water District has determined the necessity for proper construction agreement for development of water and/or sewer system within proposed subdivision development. NOW, THEREFORE BE IT RESOLVED that policy shall be as follows: 1. Upon receipt of one print of Tentative Map, District will write letter to Real-Estate Commissioner and County Health Department stating the conditions of service. 2. Upon submittal of three prints of the Tentative Mahr, together with a deposit to cover the estimated cost of engineering for hydraulic analysis and schematic system layout, the District will determine the sizes and locations of sewers, mains, valves, and hydrants required. One print of the Tentative Map showing these facilities schematically will be returned to the Developer or his Engineer by the District's Engineer. The system shown is subject to approval by the Directors. 3. District's Engineer will submit a print of the Tentative Map showing system layout to the Directors with recommendation for approval. Notification of approval or disapproval will be mailed to Developer or his Engineer. 4- Developer's Engineer prepares construction plans and submits one set of prints to District's Engineer for checking and approval. 5. Following approval of the construction plans, the Developer shall enter into an Agreement with the District providing for the con- struction of the system to the District standards, and also pro- viding for the acceptance of the completed systems by the District. Developer shall not commence construction until the Agreement has been approved and executed by the District. If a commitmenthis required of the District as to water or sewerage service, or if any portion of the District's existing system is to be modified, a bond is required. PASSED, ADOPTED AND APPROVED this 18th day of November 1963, by the following polled vote: AYES: Directors: Blarechard, Mahr Paul Smith and Trussell NOES: Directors: None ABSENT: Directors: None Oby Blanchard, President of the Board of Directors and the San Marcos County Water Dist. Jeanne M. Gist, Secretary of the San Marcos County Water District and Board of Directors thereof SAN MARCOS COUNTY WATER DISTRICT ,,Suggested Chronological Procedure for Construction of Water and Sewerage Systems inSubdivision-Type Delopments 1. Upon receipt of one print of Tentative Map, District will write letter to Real-Estate Commissioner and County Health Depart- ment stating the conditions of service. 2. Upon submittal of three prints of the Tentative Map, together with a deposit to cover the estimated cost of engineering for hydraulic analysis and schematic system layout, the District will determine the sizes and locations of sewers, mains, valves, and hydrants required. One print of the Tentative Map showing these facilities schematically will be returned to the Developer _ or his Engineer by the District's Engineer. The system shown is subject to approval by the Directors. 3. District's Engineer will submit a print of the Tentative Map showing system layout to the Directors with recommendation for approval. Notification of approval or disapproval will be mailed to Developer or his Engineer. 4. Developer's Engineer prepares construction plans and submits one set of prints to District's Engineer for checking and approval. ~ 5. Following approval of the construction plans, the Developer shall enter into an Agreement with the District providing for the con- struction of the systems to the District standards, and also pro- viding for the acceptance of the completed systems by the District. Developer shall not commence construction until the Agreement has been approved and executed by the District. If a commitment is required of the District as to water or sewerage service, or' iflany portion of the District's existing system is to be modified, a bond is required. 7 -8-64