Ord 0175 04/2012ORDINANCE NO. 175
AN ORDINANCE OF THE BOARD OF DIRECTORS
OF THE VALLECITOS WATER DISTRICT
MODIFYING WATER CAPITAL FACILITY FEES
IN FISCAL YEAR 2012 -2013
BE IT ORDAINED by the Board of Directors of the Vallecitos Water District ( "District') as
follows:
Section 1 Declaration of Policy and Background On August 3, 2011, the District Board of
Directors adopted the 2008 Water, Wastewater, and Water Reclamation Master Plan ( "2008 Master
Plan"). Concurrent with the adoption of the 2008 Master Plan, and in compliance with the California
Environmental Quality Act ( "CEQA "), the Board of Directors certified the Final Program
Environmental Impact Report for the 2008 Master Plan ( "2008 Master Plan PEIR "). The District
used information and data from the 2008 Master Plan and PEIR to prepare a Water, Wastewater
Capital Facility Fee and Wastewater Density Impact Fee Study ( "Study ") and calculated a reasonable
Water Capital Facility Fee structure and methodology that reflects the costs of financing and
construction of the proposed facilities in the 2008 Master Plan. The Study analyzes the capital
facilities needed by the District to serve the growing demands of new development, and the proposed
Water Capital Facility Fees do not exceed the reasonable costs of financing and constructing the
needed improvements.
The Study was approved by the Board of Directors at a public meeting on March 21, 2012
and an Updated Study is approved as part of this ordinance. The Updated Study substantiating the
proposed fees was made available for public inspection and review ten (10) days prior to the public
meeting and notice was given in compliance with Government Code section 66016.
During the period from January 2010 through February 2012, the District held over 20
workshops and meetings with interested parties including representatives from the development
community, the Building Industry Association of San Diego, and consulting engineers to review,
discuss, and receive input on the 2008 Master Plan, the Master Plan PEIR, the Draft Study, and the
basis and methodology substantiating the proposed Water Capital Facility Fees.
The District, by this ordinance, desires to adopt the Water Capital Facility Fee Schedule
which is attached hereto as Exhibit "A" and incorporated herein by reference for fiscal year 2012-
2013 and reflects the information and data taken from the 2008 Master Plan and Updated Study.
The Board of Directors of the District considered modifying the Water Capital Facility Fee
Schedule after conducting a public hearing at a public meeting on April 18, 2012, in accordance with
Government Code section 66018.
Section 2 . Findings The Board of Directors of the District finds and determines as follows:
(a) Purpose of the Fee The purpose of the Water Capital Facility Fee is to provide an
adequate water supply and distribution system to serve new development within the District's
service area and to provide adequate funding for future financing and construction of facilities
described in the 2008 Master Plan.
Ordinance No. 175 . Page 2
(b) Use of Fees All Water Capital Facility Fees as listed on the Water Capital Facility
Fee Schedule, shall be used to finance and construct the applicable storage and transmission
facilities described in the 2008 Master Plan, including debt service. Water Capital Facility Fees
shall not be used for repair, maintenance, replacement or operational expenses.
(c) Relationship Between Use of Fee and Type of Development Water Capital Facility
Fees will be charged to new development projects and existing users increasing capacity as
measured by Equivalent Dwelling Units ( "EDU's) and meter size, which takes into consideration
land use designations in the 2008 Master Plan and the amount of the demands.
(d) Relationship Between Need for Capital Facilities and Type of Project In order to
provide adequate water service, all new development within the District's service area will
require the capital facilities specified in the 2008 Master Plan.
(e) Relationship Between Amount of Fee and Cost to Particular Proiects Water Capital
Facility Fees for each new development project shall be based upon the demand of a particular
project on the District's water system through the analysis of land designation, size of property to
be served, and type of use.
(f) Reasonable Relationship Water Capital Facility Fees do not exceed the estimated
reasonable cost of providing the service for which the charge is imposed and the Water Capital
Facility Fee Schedule insures that each user will pay a fair share of new facility construction
based upon actual demands upon the water system.
(g) Environmental Review In accordance with the California Environmental Quality Act
Guidelines Section 15061, the Board of Directors ordains that the Water Capital Facility Fees
established by this ordinance are exempt from CEQA for the following reasons:
1. The Water Capital Facility Fees are not a "project" as defined by Guidelines
Section 15378;
2. The project is exempt in accordance with Guidelines Sections 15273(1), 15273(3),
and 15274(4); and
3. The activity will not have any significant impact upon the environment pursuant to
Guidelines Section 15061(b)(3).
The Board of Directors of the District orders and directs that the foregoing exemptions and
reasons be made a part of the Notice of Exemption and that the Notice of Exemption be filed
with the County Cleric of the County of San Diego.
(h) Cost Estimates The cost estimates set forth in the 2008 Master Plan and Study are
reasonable estimates for the financing and construction of capital facilities shown and the
development fees expected to be generated by new demand will not exceed a total of these
estimated costs.
Ordinance No. 175 - Page 3
Section 3 Segregated Accounts and Their Accounting The District has established separate
accounts in its accounting records segregating water capacity fee revenue and related interest accrued
thereon from other revenue and funds of the District. For each separate account, the District's
finance officer shall, within one hundred eighty (180) days after the last day of each fiscal year, make
available to the public and present to the District's Board of Directors a written report containing all
of the information required by Government Code section 66013(d).
Section 4 . Water and Wastewater Study All development projects at the sole expense of the
developer shall be required to complete a Water and Wastewater Study which analyzes and calculates
the impacts of the development project on the water system. The Water and Wastewater Study shall
also provide the basis for local benefit impacts and improvements.
Section 5 . Commitment of Capital Facility Fees All Water Capital Facility Fees collected and
remaining unexpended on the effective date of this ordinance and all future development fees
collected pursuant to this ordinance and related interest thereon are committed by appropriation to the
District's capital improvement program and the facilities described in the 2008 Master Phan and
Study.
Section 6 Water Capital Facility Fee Schedule and Inflationary Increases On January 1 of each
calendar year, the District will adjust the Water Capital Facility Fee Schedule based on the annual
percentage change in the Engineering News Record Construction Cost Index.
Section 7 . Effective Date This ordinance shall be effective immediately upon passage by the
Board of Directors. The secretary of the District shall publish a summary of this ordinance two (2)
times on successive weeks in an adjudicated newspaper of general circulation within the District.
The Water Capital Facility Fees established by this ordinance shall be effective at 12:00 a.m. on July
1, 2012, more than sixty (60) days after adoption of this ordinance in accordance with Government
Code section 66017.
Section 8 San Diego County Water Authority Capacity Fees The District shall collect the
capacity fees established by the San Diego County Water Authority in accordance with their
requirements as set forth from time to time. Any increases in San Diego County Water Authority
capacity fees shall automatically be passed through and all protests or objections to the San Diego
County Water Authority capacity fees should be directed to: San Diego County Water Authority,
4677 Overland Avenue, San Diego, CA 92123.
Section 9 Time of Payment of Water Capital Facility Fees Water Capital Facility Fees shall
due and payable prior to commitment of service pursuant to the provisions of Resolution No. 1343.
Section 10 . Non - Refundable To assure availability for proper planning and to meet obligations
incurred by the District to develop capacity in the District's water system in a timely manner, all
Water Capital Facility Fees collected shall be non - refundable and non - transferable.
Section 11 . Interpretation and Severability Each and every section, subsection, sentence,
clause, phrase, part, or portion of this ordinance shall be construed at all times so as to be in
Ordinance No 175 Page 4
compliance with all federal, state, and local laws, roles, and regulations governing development fees.
If any section, subsection, sentence, clause, phrase, pan, or portion of this ordinance as so interpreted
is held to be invalid or unconstitutional by a final judgment of a court of competent jurisdiction, such
decision shall not affect the validity of the remaining portions of this ordinance. The Board of
Directors of the District hereby declares that this measure, and each section, subsection, sentence,
clause, phrase, part, or portion of this ordinance would have been adopted or passed irrespective of
the fact that any one or more sections, subsections, sentences, clauses, phrases, parts, or portions of
this ordinance are declared invalid or unconstitutional. In the event a court of competent jurisdiction
determines that any sentence, clause, subsection, section, phrase, or any part or portion of this
ordinance is invalid or unconstitutional, the Board of Directors of the District hereby expressly
requests that the court sever the invalid portion of this ordinance and declare the balance of the
ordinance to be valid.
Section 12 . Limitation on Judicial Review Any judicial action or proceeding to attack, review,
set aside, void, or annul this ordinance or any water capital facility fee increase adopted as a result of
this ordinance shall be brought no later than one hundred twenty (120) days following the date this
ordinance has been adopted by the Board of Directors of the Vallecitos Water District. Any action
not filed within the 120 -day period shall be forever barred.
ALL OTHER ORDINANCES, ARTICLES, OR SECTIONS OF ORDINANCES, OR
AMENDMENTS IN CONFLICT HEREWITH ARE HEREBY REPEALED. - --
PASSED, APPROVED, AND ADOPTED by the Board of Directors of the Vallecitos Water
District at a regular meeting this 18th day of April 18, 2012, by the following roll call vote:
AYES: FERGUSON, POLTL, SHELL
NOES:
ABSENT: GENTRY, HERNANDEZ
ABSTAIN:
1 imothy M. Mell, Vice President
Board of Directors
Vallecitos Water District
ATTEST
f [�
Dennis 0. Lamb, Secretary
Board of Directors
Vallecitos Water District
EXHIBIT A
Vallecitos Water District
Water Capital Facility Fee Schedule
Adopted: April 18, 2012
Effective: July 1, 2012
The Equivalent Dwelling Unit (EDU) is established as 500 gallons per day (GPD). A 5/8" meter
is equal to one EDU. Meters larger than 5/8" are equal to a base of 1 EDU times the incremental
increase in meter continuous flow rate in gallons per day (see schedule below).
2. Water meter size and amount of capacity to be purchased is determined by using 2008 Master
Plan criteria, land use, information submitted by the applicant, and the project's Water and
Wastewater Study, if applicable. The minimum capacity shall be based on the 2008 Master Plan
land use designations. Purchase of additional capacity may be required and separate landscape
meters are required except for single family residences.
3. Residential and small commercial applicants for service on lots smaller than one acre are subject
to the purchase of water capacity for 5/8" (1 EDU) or 3/4" (1.5 EDUs) meter.
4. All other applications for water service must be submitted to the District for analysis and
determination of meter size and amount of capacity to be purchased, with a minimum capacity of
1 EDU. After service has connnenced, accounts will be monitored for usage and if the purchased
capacity is exceeded based on the most recent twelve -month average, the customer will be
notified by the District and be given the option to purchase additional capacity or to have a
surcharge on water consumption over the purchased capacity added to the monthly bill, or the
customer must significantly reduce consumption within three months.
5. Water Capital Facility Fees are modified to $6,495 per EDU ($12.99 per GPD) to be adjusted
amorally per Section 6 of this ordinance.
6. The Water Capacity Surcharge is established as $2.13 per unit (hundred cubic feet).
7. The Water Meter Base Capacity Schedule is established as minimum for each meter size_
Meter
Units per
Base Capital
Size
EDU
GPD
Month*
Facility Fee
1.0
500
30
$ 6,495
3 /4"
1.5
750
45
9,743
1
2.5
1,250
75
16,238
1 1 /z"
6.0
3,000
180
38,970
2
8.0
4,000
240
51,960
3
17.5
8,750
525
113,663
4
25.0
12,500
750
162,375
(Meters larger than 4" are restricted to fire service purposes unless request is
submitted to the Board of Directors for consideration.)
*Based on annual average.
Emil J� nc bmg.Jr_ Rttadcr Co
m j Ctcrk
NOTICE OF EXEMPTION MAY 2 ?.012
FOR RATE INCREASE ORDINANCES BY E. Tamez
DEPUTY
To: Office of the County Cleric From: Vallecitos Water District
County of San Diego 201 Vallecitos De Oro
1600 Pacific Highway, Suite 260 San Marcos, CA 92069
San Diego, CA 92101
SUBJECT: Filing notice of CEQA statutory exemption under California Public Resources
Code Section 21080(b)(8) and Title 14 California Code of Regulations Section 15273.
ACTIVITY: By Ordinance Nos. 175,176, and 177, Vallecitos Water District ( "VWD") has
established new Water Capital Facility Fees, Wastewater Capital Facility Fees, and
Wastewater Density Impact Fees (collectively, the "Fees ").
DISTRICT SERVICE AREA AND SERVICES: VWD is located in north Sail Diego
County and provides water and wastewater service to the City of San Marcos, portions of the
cities ofEscondido and Carlsbad, andportions ofunincorporated areas ofSanDiego County.
DESCRIPTION OF ACTIVITY: The Fees will raise funds to meet operating expenses,
purchasing or leasing supplies, equipment or materials; meeting financial reserve needs and
requirements, and to obtain fonds for capital projects necessary to maintain water and
wastewater service to customers within VWD's existing service areas. The Fees are not to
raise funds to either expand VWD's services or its existing service area.
EXEMPT STATUS: V WD has determined that its enactment of Ordinances 175, 176, and
177 to establish such Fees are activities exempt from the application of CEQA under Public
Resources Code Section 21080(b)(8); and, that such activities do not constitute a "project"
within the meaning of CEQA. (See also, Title 14 California Code of Regulations Section
15273.
CONTACT PERSON: Jeffrey G. Scott, Esq., General Counsel, Vallecitos Water District,
telephone number: (858) 675 -9896.
V
Dated: May 22, 2012
BY:
FILED hN THE OFFICE OF THE COUNTY CLERK
San D1990 CouMl+Onr 4Y -2-24W
Pos ted MAY 9 _2011— Roloved
WATER DISTRICT
Counsel
_ -_Rett media
Deputy,."..,