Loading...
Reso 0268-11/1966 RESOLUTION 268 RESOLUTION OF THE BOARD OF DIRECTORS OF THE SAN MARCOS COUNTY WATER DISTRICT FIXING AND DETERMINING POLICY FOR TEMPORARY CONSTRUCTION WATER METERS AND FOR TEMPORARY AGRICULTURAL WATER METERS. WREREAS, the San Marcos County Water District has from time to time been requested to provide water on a temporary basis for construction projects, and WHEREAS, said District has been requested to provide water on a temporary basis for agricultural production, and WHEREAS, the District's existing rules and regulations do not provide for the installation of said temporary services. NOW, THEREFORE, BE IT RESOLVED as follows: Section I: The Board of Directors of the San Marcos County Water District does hereby establish a policy for the installation of temporary meters as follows: A. A temporary construction meter may be installed upon receipt by the District of a duly executed written application, indicating the preferred location and proposed use of said temporary construction meter accompanied by: (1) A deposit equal to cost of meter. This deposit will be refunded if and when the meter is returned to the District in good order. (2) A fee in the amount of the estimated installation and removal costs of said temporary meter. These estimated costs shall be determined by the District. (3) A deposit in the amount of the District's estimate of one months billing for water charges. Should this deposit be in excess of the charges for water use accruing against that account, said excess will be refunded when said account is terminated. (4) The ready to serve charge will be as per District's current water rate schedule, but not less than $10.00 per month. The water rate shall be as per District's current water rate for domestic water. The current rate, as of July 1, 1966 is 24 cents per unit. B. A temporary agricultural meter may bc installcd upon receipt by the District of a duly executed written application by the owner of the property on which the water is to be used, accompanied by: (1) A deposit equal to the cost of the meter. This deposit will be refunded if and when the meter is returned to the District in good order. (2) A fee in thc amount of the estimated installation and removal costs of Said agricultural meter. These costs shall be determined by the District. Resolution ~ 268 Page 2 (3) The water rate, applicable to a temporary agricultural meter shall be the same as the District's current water rates, including the ready to serve charges. Section NO temporary meter shall be installed until and unless a written application is made therefor on the usual District form accompanied by a Cash deposit as herein set forth. The District at all times reserves the right to determine the location and size of said meters, and further reserves the right to reduce the size of said meters at any time, and to terminate said temporary Service after four weeks notice. Notice shall consist of a registered letter, stating the intended termination, mailed to the owner's address as shown on the service application. Section III: The owner of the land shall be responsible for all charges incurred by meter installation, removal and water usage in accordance with District policy. Section If applicant expects to use less than 8000 cubic feet (60,000 gallons) of water during a period, not exceeding one week, the applicant will be allowed to obtain water from a 2" meter, installed at the District's office, after a deposit of $20.00 has been made by the applicant. Should said deposit be in excess of the charges for the water at the current domestic rate said excess will be refunded at the termination of the water use. Section V: Applicants shall comply with all rules and regulations as from time to time are established by the Board of Directors of the San Marcos County Water District. All previous resolutions and ordinances in conflict herewith are repealed. ADOPTED THIS 7th DAY OF November, 1966. AYES: DIRECTORS; Blanchard, Mahr, Trussell and Vanderbeck NOES: DIRECTORS: None ABSENT: DIRECTORS: Paul President the Board of Directors of the San Marcos County Water District Secretary of the San Marcos County Water District and the Board of Directors thereof CONSTRUCTION METER COST 10/25/66 The following meter installation prices are valid for connection of meters to: (1) Fire Hydrants; (2) Blow Offs 5/8' meter Material & meter: $ 40.00 Install & remove: 10.00 Ready to Serve : 10.00 Advance billing : 10.00 Total $ 70.00 1" meter Material & meter: $ 80.00 Install & remove: 10.00 Ready to Serve : 10.00 Advance billing : 20.00 Total $120.00 11/2' meter Material & meter: $150.00 install & remove: 10.00 Ready to Serve : 15.00 Advance billing : 25.00 Total $200.00 2'" meter(short torrent) Material & meter: $210.00 Install & remover 15.00 Ready to Serve : 25.00 Advance billing : 50.00 Total $300.00