Reso 0720-04/1985 RESOLUTION NO. 720
RESOLUTION OF THE BOARD OF DIRECTORS OF
THE SAN MARCOS COUNTY WATER DISTRICT
PROVIDING STANDARD PROVISIONS FOR AGREEMENTS
FOR CONSTRUCTION OF UTILITY SYSTEMS
TO BE DEDICATED TO THE DISTRICT
WHEREAS, the Board of Directors of the SAN MARCOS COUNTY WATER
DISTRICT have found and determined that it is to the best interest of the
District that standard provisions be included in agreements for the
construction of water and sewer systems which are to be dedicated to the
District for ownership and maintenance after completion of the system and
acceptance by the District.
NOW, THEREFORE, THE BOARD OF DIRECTORS OF THE SAN MARCOS COUNTY
WATER DISTRICT DOES RESOLVE AS FOLLOWS:
Section 1: All agreements for the construction of water or sewer
systems for acceptance by the District shall include the provisions of
agreement set forth below and shall include the insertions necessary to
complete the agreement by details of the particular circumstances and details
of the transaction.
Section 2: The Agreement shall include the following provisions:
IT IS AGREED BY AND BETWEEN THE PARTIES HERETO AS FOLLOWS:
1. In consideration of the approval by DISTRICT of tbe plans and
specifications for the construction of the work herein referred to and the
conmitment to be made by DISTRICT for utility service to said developnent,
DEVELOPER agrees to do and perform, or cause et
DEVELOPER's own expense and without any cost or 1 S ~ of
the public works and improvements required to be done in a good and
workmanlike manner satisfactory to DISTRICT, all in strict conformity and in
accordance with the plans and specifications covering said work, the standard
specifications and drawings for construction approved by DISTRICT and this
Agreement. DEVELOPER will furnisb all transportation, equipment, labor,
services, permits, utilities, and all other items necessary to complete said
work, will pay and discharge all bills and claiming arising out of the
performance of said work, and will furnish accurate "as constructed" plans.
DEVELOPER agrees to rou h grade and install all portions of the sewer and
water system to be locat~ in future streets to to street
conform final grade.
2. DISTRICT, without liability to DISTRICT, DISTRICT's Engineer
and their consultants, and each of their directors, officers, employees and
agents, may require such changes, alterations, or additions to the plans and
specifications which do not exceed ten percent (10%) of the original DISTRICT
estimated cost of the work as may be determined necessary or desirable by
DISTRICT in its sole discretion, includi those necessary due to errors or
omissions in the approved plans or specifications. Changes, alterations
additions without said 10% limitation may be made for unforeseen conditions
Resolution No. 720
Page 2
such as rock excavation, unstable soil conditions or high water tables
requiring dewatering.
3. DEVELOPER shall, at DEVELOPER' s sole cos t and expense, be
solely and completely responsible for all matters affecting the prosecution,
progress and completion of the work, (both on and off the jobsite) and for
observing all laws and providing for public convenience and safety, safety of
workers (including his workers and those of his contractors, subcontractors
and suppliers and others contributing to the work) and others, protection of
property and rights of others, including the location, maintenance and
replacement of utilities whether shown on the plans or not, prior notification
to utility owners, drainage from storm runoff, and all easements, rights of
way and encroachment permits. Nothing in the Agreement, the specifications,
or other contract documents or DISTRICT' s approval of the plans and
specifications or inspection of the work is intended to include a review,
inspection, acknowledgement of or responsibility for any such matters and
DISTRICT, DISTRICT' s Engineer, and their consultants, and each of their
directors, officers, enmployees and agents, shall have absolutely no
responsibility or liability therefor.
4. DEVELOPER shall comply with the requirements of the Labor Code
of the State of California contained in Division 2, Part 7, Chapter 1, PUBLIC
WORKS, in the prosecution, progress and completion of the work to be performed.
5. To the fullest extent permitted by law, DEVELOPER shall
indemnify and hold harmless DISTRICT, DISTRICT ' s Engineer, and their
consultants, and each of their directors, officers, agents and employees from
and against all liability, claYm.q, damages, losses, expenses, and other costs,
including costs of defense and attorneys' fees, arising out of or resulting
from or in connection with the performance of the work, both on and off the
jobsite, provided that any of the foregoing: (1) is attributable to bodily
injury, sickness, disease or death, or to injury or to destruction of tangible
property (other than the work itself) including the loss of use resulting
therefrom, and (2) is caused in whole or in part by any act or emission of the
DEVELOPER, any contractor, any subcontractor, any supplier, anyone directly or
indirectly employed by any of them or anyone for whose acts or omissions any
of them may be liable, regardless of whether or not it is caused in part by
any act or omission (active, passive, or comparative negligence included) of a
party indemnified hereunder. Such obligation shall not apply to any loss,
damage or injury as may be caused solely and exclusively by the fault or
negligence of a party indemnified.
6. Simultaneously with the execution of this Agreement, DEVELOPER
shall furnish and deliver to DISTRICT, at no expense to DISTRICT, a payment
bond and a faithful performance bond each in the amount of the cost as
estimated by the District. Bonds shall be furnished by surety companies
satisfactory to the DISTRICT. Surety companies, to be acceptable to the
DISTRICT, must be authorized to do business and have an agent for service of
process in California, and be on the accredited list of the United States
Treasury Department, and their bonds will be limited to such amounts as would
be accpetable to the Treasury Department.
Resolution No. 720
Page 3
7. None of the following shall in anyway affect the obligation of
any surety and each suret waives notice thereof: (a) any change, extension
of time, alteration or additions to the terms of the Agreement, or the work to
be performed, or the lans and specifications therefor; or (b) any matters
unknown to surety whic~ might affect surety's risk except that DISTRICT will
advise surety upon request of the following: (1) any written claims it
receives from unpaid subcontractors or suppliers, and (2) any written orders
received from other ublic authorities charging violations of laws, ordinances
or regulations, and ~) failure of DEVELOPER to comply with any written notice
to correct defective work. The obligation of UEVELOPER shall not in anywise
be limited by the amount of such bonds.
8. If permitted by the Agreement, in lieu of the bonds provided
for in the preceding paragraph, DEVELOPER may furnish DISTRICT either an
Instrument of Credit or an Agreement of Deposit as security for the faithful
performance of this Agreement (in amount not less than 1007o of the cost as
estimated by DISTRICT) and for payment of those furnishing materials, labor or
equipment (in amount not less than 10070 of the cost as estimated by
DISTRICT). Said Security Agreements shall he on forms furnished by DISTRICT.
No alterations or substitution of said forms will be allowed. The obligations
of DEVELOPER shall not in anywise be limited by the amount of the security
required.
9. Until such time as all improvement proposed to he constructed
in said development, including streets, curbs, drains, sewers, gas and utility
lines, grading, etc., have been ccepleted and accepted by DISTRICT and all
other public authorities having jurisdiction, DEVELOPER shall be responsible
for the care, maintenance of, and any danage to the utility system within the
proposed development which is covered by this Agreement.
10. When the work or any portion of it is sufficiently complete to
be utilized or placed into service, the DISTRICT shall have the right upon
k
written notification to the DEVELOPER to utilize such portions of the wor and
to place the operable portions into service and to operate ssme.
11. Upon said notice and commencement of utilization or operation
bt~ the DISTRICT, the DEVELOPER shall be relieved of the duty of maintaining
e portions so utilized or placed into operation; provided, however, such use
and operation shall not relieve the DEVELOPER of the full responsibility for
completing the work in its entirety, for making good defective work and
materials, for protecting the work from damage, and for being responsible for
danage and for the work as set forth herein nor shall such action by the
OISTRICT be deemed completion and acceptance, and such action shall not
relieve the DEVELOPER, or DEVELOPER's sureties and insurers of the provisions
hereof relating to indenmity and guarantees.
12. Acceptance of the work shall only he by action of the Board of
failure to inspect shall constitute a waiver by DISTRICT of any Inns or
the
work. From and after acceptance, the work shall be owned and operated by
DISTRICT. DISTRICT shall be obligated to furnish water only upon acceptance
of the work by the DISTRICT.
Resolution No. 720
Page 4
13. The DEVELOPER guarantees all work for a period of one (1) year
after the date of acceptance of the work by the DISTRICT and shall repair and
replace any and all such work, together with any other work which may be
displaced in so doing, that may prove defective in workmanship or materials or
beth within the one-year period from date of acceptance, without expense
whatsoever to the DISTRICT, ordinary wear and tear and unusual abuse or
neglect excepted. In the event or failure to comply with the above-mentioned
conditions within one (1) week after being notified in writing, the DISTRICT
is hereby authorized to proceed to have the defects repaired and made good at
the expense of the DEVELOPER who hereby agrees to pay the cost and charges
therefor inmediately on demand. Prior to acceptance of the utility system by
DISTRICT, DEVELOPER shall file with DISTRICT surety bond in a penal sum equal
to twenty-five (25%) percent of the estimated cost of the work guaranteeing
the work from defects for a period of one (1) year from the date of acceptance
of the utility system.
14. If, in the opinion of the DISTRICT, non-conforming work creates
a dangerous condition or requires immediate correction or attention to prevent
further loss to the DISTRICT or to prevent interruption of operations of the
DISTRICT, the DISTRICT will attempt to give the notice required by this
paragraph. If the DEVE~DPER cannot be contacted or does not comply with the
DISTRICT's request for correction within a reasonable time as determined by
the DISTRICT, the DISTRICT may, notwithstanding the provisions of this
paragraph, proceed to make such correction or provide such attention; and the
costs of such correction or attention shall be charged against the DEVELOPER.
Corrective action by the DISTRICT will not relieve the DEVELOPER of the
guarantees and indenmities provided in this paragraph or elsewhere in this
Agreement.
15. This paragraph does not in any way limit the guarantee on any
items for which a longer guarantee is specified or on any items for which a
manufacturer or supplier gives a longer guarantee period. DEVELOPER agrees to
act as a co-guarantor with such manufacturer or supplier and shall furnish
DISTRICT all appropriate guarantee or warranty certificates upon completion of
the project. No guarantee period whether provided for in this section or
elsewhere shall in any way limit the liability of DEVELOPER or DEVELOPER's
sureties and insurers under the indemnity or insurance provisions of this
Agreement.
16. DEVELOPER shall, at DEVELOPER's sole cost and expense, furnish
DISTRICT with appropriate easements, for the entire utility system, including
offsite lines, guaranteeing DISTRICT marketable title, free and clear of all
liens, encumbrances, restrictions and covenants other than current real
property taxes then a lien but not yet payable. As a condition to recordation
of said easements, DEVELOPER, at DEVELOPER's sole cost and expense, shall
furnish DISTRICT with an acceptable title insurance policy insuring DISTRICT
has title as above required; bowever, said policy shall not be of an amount
less than the estimated cost of the work and shall include an endorsement
insuring DISTRICT against the amount of mechanic's lien claims and stop
notices arising out of the performance of the work. Said easement shall be in
standard easement form acceptable to DISTRICT, shall not be less than the
width DISTRICT determines necessary to maintain said system, and shall be
Resolution No. 720
Page 5
recorded prior to DISTRICT accepting the work or furnishing utility service to
any portions of the lands within the development (other than construction
water as may be delivered under a temporary service agreement with DEVELOPER).
17. If the DEVELOPER refuses or fails to prosecute the work or any
separable part thereof with such diligence as will ensure its completion
within the time specified herein, or any extension thereof, or fails to
or if he should make a general assigmnent for the benefit o~
, his
creditors, or if a receiver should be appointed on account of his insolvency,
or if he, his contractor, or any of their subcontractors should violate any of
the provisions of this Agreement, or if he should persistently or repeatedly
f should fail, except in cases for which extension of time is
re use or
provided, to supply enough properly skilled workmen or proper materials to
complete the work in the time specified, or if he should fail to make prompt
payment to subcontractors or for mater ials or labor or if he should
persistently disregard laws, ordinances, or instructions of the DISTRICT, the
DISTRICT may serve written notice upon the DEVELOPER and his surety of its
intention to declare this Agreement in default, said notice to contain the
reasons for such intention to declare a default, and unless within ten (10)
days after the service of such notice such violations shall cease and
satisfactory arrangements for the corrections thereof be made, this Agreement
shall upon the expiration of said ten days be in default.
18. Upon such default, the DISTRICT shall serve written notice
thereof upon the surety and the DEVELOPER, and the surety shall have the right
to take over and perform this Agreement; provided, however, that if the surety
within 15 days after the serving upon it of a notice of default does not give
the DISTRICT written notice of its intention to take over and perform this
Agreement or does not cornhence performance thereof within 30 days from the
date of serving said notice, the DISTRICT may take over the work and prosecute
the same to the extent of completion it deems necessary by contract or by any
other method it may deem advisable for the account and at the expense of the
DEVELOPER, and his surety shall be liable to the DISTRICT for any cost or
other damage occasioned the DISTRICT thereby, and in such event the DISTRICT
may, without liability for so doing, take possession of and utilize in
completing such work, such materials, appliances, plants, and other property
belonging to the DEVELOPER that may be on the site of the work and be
necessary therefor. For any portion of such work that the DISTRICT elects to
complete by furnishing its own employees,materials, tools, and equipment, the
DISTRICt shall receive reasonable compensation therefor.
DISTRICT may, at its option, elect not to complete any or all of the
work and may elect not to accept any of the work already completed. If
DISTRICT elects not to accept any of the work, then all DISTRICT's obligations
to DEVELOPER and the lands to be served shall terminate. DISTRICT' s
obligations to DEVELOPER and the lands to be served shall continue to the
extent of any acceptance, subject to DISTRICT's right to offset any sums due
it.
19. The foregoing provisions are in addition to and not in
limitation of any rights or remedies available to the DISTRICT.
Resolution No. 720
Page 6
20. If the work is suspended or otherwise not continuously
prosecuted for any cause whatsoever, within or without the time for
completion, DEVELOPER shall, at his sole cost and expense, remove and replace
all or any portion of the work already completed and inspected which the
DISTRICT, in its sole discretion, determines could have been danaged. '
21. Nothing in this Agreement shall relieve DEVELOPER, or
DEVELOPER's successors or assigns of any obligation to pay any connection,
installation, expansion or other fees and charges required under any present
or future established ordinances, rules, regulations and policies of DISTRICT.
22. Application for water meters shall only be accepted or
connection to the DISTRICT sewer main allowed and the installation of water
meters shall only be made after the water line has been accepted by the
DISTRICT and after as-built mylars have been provided to the DISTRICT.
DEVELOPER agrees that DISTRICT may inform his Engineer as to when the
"as-built" mylars are to be corrected and turned over to DISTRICT as permanent
records at DEVELOP~'s sole cost and expense.
23. Prior to placing the new water system in service, construction
water must be obtained from a construction meter(s) served by the existing
water distribution system. DEVELOPER must use construction meters for
landscaping, road grading or construction purposes. When the new water
distribution system is placed into service, all service outlets shall be
locked. The DEVELOPER may then make application for subdivision construction
water via "j,~mpers" for on-site usage in accordance with DISTRICT Rules and
Regulations.
24. Shut down of any existing DISTRICT water main for the purpose
of connecting a new pipeline to an existing DISTRICT pipeline will be at the
sole convenience and discretion of the DISTRICT. During periods of high water
demands, the shut downs on pipelines which are critical for water supply may
not be allowed until water demands are substantially reduced.
25. Miscellaneous Provisions.
25.1 Venue. In the event of any legal or equitable
proceeding to enforce or interpret the terms or conditions of this Agreement,
the parties agree that venue shall lie only in the Federal or State courts in
or nearest to the North County Judicial District, County of San Diego, State
of California.
25.2 At torney ' s Fees. In the event of any legal or
equitable proceedings or arbitration to enforce or interpret the terms of this
Agreement, the prevailing party shall be entitled to all reasonable attorneys'
fees and costs in addition to any other relief granted by law. This provision
shall apply to the entire Agreement.
25.3 Entire Agreement. This Agreement, together with all
the exhibits attached to this Agreement, contains all the representations and
the entire understanding between the parties with respect to the subject
matter of this Agreement. Any prior correspondence, memoranda or agreements,
whether or not such Correspondence, memoranda or agreements are in conflict
Resolution No. 720
Page 7
with the Agreement, are intended to be replaced in total by this Agreement and
its exhibits.
25.4 Assignment. The DEVELOPER shall not be entitled to
assign all or any portion of their rights or obligations contained in this
Agreement without obtaining the prior written consent of DISTRICT, which
consent shall not be unreasonably withheld. Any purported assignment without
DISTRICT's written consent shall be void.
benefit of and be binding upon the parties etTee tre ve~ c
successors, heirs and assigns.
25.6 Applicable Law. This Agreement and any disputes
relating to this Agreement shall be construed under the laws of the State of
California.
PASSED AND ADOPTED at a regular meeting of the Board of Directors of
the SAN MARCOS COUNTY WATER DISTRICT this 1st day of April, 1985, by the
following roll call vote:
Ayes: Directors: Newport, Rutherford, Mason, Mahr, Ferguson
NOB: Directors: None
ABSTAIN: Directors: None
ABSENT: Directors: None
San Marcos County Water District
ATTEST:
William W. Rucker, Secretary
Board of Directors
San Marcos County Water District