Reso 0608-07/1981 127
RESOLUTION NO. 608
RESOLUTION OF THE BOARD OF DIRECTORS OF THE
SAN MARCOS COUNTY WATER DISTRICT, CERTIFYING
COMPLETION OF FINAL SUPPLEMENT TO THE FINAL
ENVIRONMENTAL IMPACT REPORT OF PROPOSED ALIGN-
MENT CHANGE OF LAND OUTFALL PROJECT NO. C-06-
1571-010; MAKING FINDINGS IN ORDER TO MITIGATE
OR AVOID SIGNIGICANT EVNIRONMENTAL EFFECTS:
AUTHORIZING FILING OF A NOTICE OF DETERMINATION
ON SAID PROJECT: AND MAKING OTHER DETERMINATIONS
WHEREAS, this Board of Directors proposes to change alignment of
proposed Wastewater Land Outfall described as follows:
The existing proposed project proposes that Section B-2b
described in the Final Environmental Impact Report for
the San Marcos County Water District (SMCWD) Land Outfall
December 1979, would be changed to a more northerly route.
The alignment change would shift the outfall from along
Lake San Marcos' Lake bottom, then through a new develop-
ment and tunnelling under the hills west of the lake to a
route that would follow along San Marcos Boulevard, tunnel-
ling under the hill north of Rancho Santa Fe Road. The new
alignment would then follow along the canyon south of En-
cinitas Road intersecting the original proposed route in
the Northeast 1/4 of the Northwest 1/4 of Section 19, Town-
ship 12 South, Range 3 West, San Bernardino Base and
Meridian.
hereinafter called "Project";
WHEREAS, an initial study indicates that said Project may have
significant effect on the environment; and
WHEREAS, based upon said initial study, this Board of Directors
has heretofore authorized and directed preparation of an environmental impact
report in accordance with the "California Environmental Quality Act", being
Division 13 of the Public Resources Code of the State of California, hereinafter
called "CEQA", and in accordance with the guidelines prepared and developed by
the Office of Planning and Research, being Chapter 3, Division 6, Title 14 of
the Administrative Code of the State of California, hereinafter called "State EIR
Guidelines"; and
WHEREAS, a Notice of Preparation of an environmental impact report
was mailed to all responsible agencies; and
WHEREAS, this Board of Directors has heretofore preliminarily
approved a draft environmental impact report for the purpose of determining
environmental effects of the proposed Project, said draft environmental impact
report being entitled:
-1-
133
Resolution No. 608
as a result of and will exist only during
construction of said Project; and
(c) That certain measures to mitigate or avoid
said significant effects on the environment have
been specified in said Final Supplemental EIR.
CERTIFICATION OF FINAL SUPPLEMENTAL EIR
Section 4. That this Board of Directors does hereby certify
that said Final Supplemental EIR has been completed in compliance with CEQA and
the State EIR guidelines and that this Board of Directors does hereby further
certify that it was reviewed and considered the information contained in said
Final Supplemental EIR prior to approval of said Project.
MITIGATION MEASURES
Section 5. That this Board of Directors does hereby find and
determine that appropriate desilting facilities be installed immediately down-
stream of the tunnel portal site and that said facilities be maintained period-
ically; and construction not be allowed during the period of April 1 through
September 30 in the area of the willow thickets on the east arm of the marsh;
and normal precautions during construction of said Project to control or minimize
dust, noise and traffic and to assure proper replacement of surface materials will
mitigate or avoid each and every significant evnironmental effect identified in
said Final Supplemental EIR.
Section 6. That this Board of Directors does hereby approve said
Mitigation Measures will not have a significant effect on the environment.
Section 7. That this Board of Directors does hereby approve said
Mitigation Measures and does hereby order and direct said Project to be altered and
changed to incorporate said Mitigation Measures.
APPROVAL OF PROJECT
Section 8. That this Board of Directors does hereby authorize
and approve said Project as altered and changed pursuant to Section 7.
-4-
Resolution No. 608
DRAFT SUPPLEMENTAL E.I.R.
Section 2. That, with respect to said Draft Supplemental E.I.R.
this Board of Directors does hereby find and determine:
(a) That a Notice of Preparation of an environmental
impact report has been given in the time manner
and form required by CEQA and State EIR Guidelines;
(b) That said Draft Supplemental EIR has been completed
in the form and manner required by CEQA and State EIR
Guidelines;
(c) That a Ntoice of Completion for said Draft Supplemental
EIR has been prepared and filed in the time, form and
manner required by CEQA and State EIR Guidelines;
(d) That said Draft Supplemental EIR has been submitted for
public review and comment in the time, form and manner
required by CEQA and State EIR Guidelines;
(e) That a public hearing has been held on said Draft Supple-
mental EIR as recommended by CEQA and State EIR Guidelines;
(f) That the public hearing on said Draft Supplemental EIR
has been noticed, held and conducted in the time, form and
manner recommended by CEQA and State EIR Guidelines; and
(g) That no public agency, organization or interested person
has requested an extension of time to review and comment
on said Draft Supplement EIR within the time specified in
the Notice of Reveiw and Comment.
FINAL SUPPLEMENTAL EIR
Section 3. That, with respect to said Final Supplemental EIR
This Board of Directors does hereby find and determine;
(a) That said Final Supplemental EIR has been prepared and
completed in the form and manner required by CEQA and
State EIR Guidelines;
(b) That the only significant effects on the environment
identified in said Final Supplemental EIR will occur
-3-
129
Resolution No. 608
SAN MARCOS COUNTY WATER DISTRICT
DRAFT SUPPLEMENT TO THE FINAL ENVIRONMENTAL IMPACT REPORT
For The
SMCWD LAND OUTFALL
March 1981
hereinafter called "Draft Supplement to Final EIR; and
WHEREAS, a Notice of Completion of said Draft Supplement to Final
E.I.R was filed with the Secretary of the Resources Agency; and
WHEREAS, said Draft Supplement to the Final E.I.R. was submitted
for public review and comment and public notice was given of the completion of
said Draft Supplement to the Final E.I.R.; and
WHEREAS, a public hearing on said Draft Supplement to the final
E.I.R. was held at the time and place specified as follows:
Time Place
3:00 o'clock P.M. San Marcos County Water District
Monday, June 1, 1981 788 San Marcos Boulevard
San Marcos California
hereinafter called "public hearing"; and
WHEREAS, this Board of Directors has received, reviewed and con-
sidered a fina supplement to the Final E.I.R~ entitled
SAN MARCOS COUNTY WATER DISTRICT
FINAL SUPPLEMENT TO THE FINAL ENVIRONMENTAL IMPACT REPORT
for the
SMCWD Land Outfall
July 1981
C-06-1571-010
hereinafter called "Final Supplement to the Final E.I.R.";
NOW, THEREFORE, the Board of Directors of the San Marcos County Water
District does hereby RESOLVE, DETERMINE AND ORDER as follows:
RECITALS
Section l, That the above recitals are all true and correct.
-2-
135
Resolution No. 608
Section 9. That this Board of Directors does hereby authorize
the Secretary of his designated representative to file a Notice of Determination
on said Project with the Clerk of the Board of Supervisors for the County of San
Diego.
PASSED, ADOPTED AND APPROVED, this 6th day of July, 1981, by the
following roll call vote:
AYES: Directors: Waller, Mahr, Mason, Holm, Ferguson
NOES: Di rectors: None
ABSTAIN: Directors: None
ABSENT: Directors: None