Loading...
Reso 0473-05/1978 RESOLUTION NO. 473 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE SAN MARCOS COUNTY WATER DISTRICT APPROVING THE EXECUTION OF AN AGREEMENT BETWEEN VISTA SANITATION DISTRICT AND BROWN AND CALDWELL FOR ENGINEERING SER- VICES IN CONNECTION WITH PHASE III ENLARGEMENT AND UPGRADING OF THE ENCINA WATER POLLUTION CONTROL FACILITY WHEREAS, the Vista Sanitation District has planned for engineering services for the Phase III Enlargement and Upgrading of the Encina Water Pollution Control Facility (hereinafter referred to as the "Project"); and WHEREAS, Vista Sanitation District and other public agencies have entered into a Joint Powers Agreement, pursuant to Chapter 5 of Division 7 of Title 1 of the Government Code for the joint exercise of powers and the acquisition, construction and operation of facilities for the transmission, treatment, and the disposal of sewage which facilities comprise a single system of sanitation works and includes any expansion of such facilities by virtue of the project which is the subject of this Agreement; and WHEREAS, by a duly authorized and executed Supplemental Agreement to the aforesaid Joint Powers Agreement, Vista Sanitation District has been, and presently is, authorized to enter into the Agreement that is the subject of this Resolution, as well as to act as the administrator in connection with the subject Project; and WHEREAS, it is necessary and desirable to expand and upgrade the Encina Water Pollution Control Facility to meet environmental protection requirements of applicable regulatory bodies; and WHEREAS, Vista Sanitation District is receiving a grant from the U. S. Environmental Protection Agency for the proposed project, and desires that the Agreement with Brown and Caldwell shall be in accordance with the Amendments to Title 40 of the Code of Federal Regu- lations, Part 35, as published in the Federal Register of December 17, 1975; and -1- Resolution No. 473 WHEREAS, at regular meeting of the Joint Advisory Committee held on April 26, 1978, a motion was duly made, seconded and unanimously adopted that Vista Sanitation District be authorized to enter into the agreement attached hereto marked Exhibit "A"; and WHEREAS, some of the parties to the aforesaid Joint Powers Agreement have heretofore expressed a desire to peruse the contracts proposed to be entered into for engineering services in connection with enlargement and upgrading of the Encina Water Pollution Control Facility; and WHEREAS, changes in energy considerations and technological progress since completion of the 1975 project report require a review of said report; and WHEREAS, the agreement attached hereto marked Exhibit "A" contains, among other things, provisions for such review; and WHEREAS, it appears that the health and welfare of the public will best be served by authorizing Vista Sanitation District to enter into the aforesaid agreement. NOW, THEREFORE, BE IT RESOLVED BY the Board of Directors of the San Marcos County Water District, as follows: Section 1: That the Board of Directors of the Vista Sanitation District be, and is, hereby authorized to enter into a contract with Brown and Caldwell in the form and substance as that attached hereto marked Exhibit "A". PASSED AND ADOPTED by the By the Board of Directors of the San Marcos County WAter District at a regular meeting held on the 15th day of May, 1978, by the following roll call vote: AYES: Directors: Keebaugh, Vanderbeck, Dow, Mahr, Blanchard NOES: Directors: None ABSENT: Directors: None -2- AGREEMENT NO. 108-P-78 AGREEMENT FOR STEP 2 ENGINEERING SERVICES BET~;EEN VISTA SANITATION DISTRICT AND BROVV'N AND CALDWELL FOR PHAiE III ENLARGEMENT AND UPGRADING OF THE ENCINA WATER POLLUTION CONTROL FACILITY THIS AGREEMENT made and entered Into as of the 7th day of lune 1978 by and between the VISTA SANITATION DISTRICT, a county sanitation district, hereafter referred to as "DIstrict" or "Owner", and BROWN AND CALDWELL, a CalifornI~a corporation, hereafter referred to as "Engineer": - WtTNESSETH: WHEREAS, the District has planned for engineering services for the Phase ]]I Enlargement and Upgrading of the Encina Water Pollution Control Facility (hereIn- after referred to as the "Project"); and WHEREAS, District and other public agencies have entered into a Joint Powers Agreement, pursuant to Chapter S of Division 7 of Title 1 of the.Government Code for the joint exercise of powers and the acquisition, construction and operation of facilities for the transmission, treatment, and disposal of sewage which facilities comprise a single system of sanitation works and includes any expansion of such facilities by virtue of the project which is the subject of thid Agreement; and WHEREAS, by a duly authorized and executed Supplemental Agreement to the aforesaid Joint Powers Agreement, District has been, and presently Is, authorized to enter into this Agreement as well as to act as the administrator In connection with the subject Project; and WHEREAS, paragraphs E and F under Article I of Agreement No. VSD-100 dated July 13, 1973 are superceded and deleted by some provisions of this agreement covering the same services; and WHEREAS, said paragraphs E and F tn VSD-100 provided for "Design Services" and preparation of operation manuals, respectively; and WHEREAS, the necessity for supercedtng the aforesaid paragraphs E and F of VSD-100 ts that the scope of work for Engineer has changed since VSD-100 was entered into on July 13, 1973, and further, reduced charges for Engineer's ser- vices have been negotiated; and WHEREAS, It is necessary and desirable to expand and upgrade the Encina Water Pollution Control Facility (WPCF) to meet environmental protection re- quirements of applicable regulatory bodies; and WHEREAS, District Is receiving a grant from the U;S. Environmental Pro- tection Agency for the proposed project, and desires that this Agreement shall -2- be in accordance with the Amendments to Title 40 of the Code of Federal Require- · ments, Part 35, as published in the Federal Register of December 17, 1975; and WHEREAS, Engineer has available and offers to provide personnel and facilities necessary to accomplish the work within the required time; and WHEREAS, such available and offered personnel Include the following categories of professional employees whose services are available for work on this project for the approximate number of manhours over the project period as follows: Prelim[nary Destqn Services ,Yahor Cateoorv Approximate manhours Chief Engineer 141 Managing Engineer 584 Supervising Engineer 348 Principal Engineer 240 Senior Engineer 996 Engineer 840 NOW, THEREFORE, District and Engineer agree as follows: I. Scope of Engineerinq Services Engineer agrees to perform those services which are more particularly de- scribed hereafter. Unless modified in ~Tittng by the party to be charged, duties of Engineer shall not be construed to exceed those services specifically set forth h ere in. A. Planned EnqLneerinq Services Engineer agrees to perform those tasks described in Exhibit "A" Planned Step 2 Engineering Services, which is attached hereto and incorporated herein by reference. Compensation for planned services shall be as provided in Exhibit "B", which is attached hereto and incorporated herein by reference. B. Special Enqineerinq Services District and Engineer agree that certain of the work contemplated to be performed by Engineer cannot be defined sufficiently at the time of execution of this Agreement, and that incidental engineering work related to th~ project and not covered in Exhibit "A" may be needed during performance of this Agreement. It is intended that such categories of work be classified as Special Engineering Services. Special engineering services may include, but are not limited to, the following: -3- l. Additional copies of contract drawings, specification and other documents above the number specified to be furnished under Article I .A. Planned Step 2 Engineering Services and handling and mailing of these copies. Offset printing and bLndlng of reduced plans and specifications. The services shall also include the procurement and supervision of subcontractor retained for this work. 3. Assistance, as requested, to Dlstr[ct as expert witness In arbitration or litigation arising from the implementation of the project. 4. Provision of engineering services and/or the services of EngLneer's attorney for the purpose of preparing documentation and presentations Incident to any bid protest hearings including those In accordance with 40 CFR 35.939. 5. Provide assistance to District during bidding. periods to include distribution of plans and specifications, preparation and prlnting ofadde attendance at a pre-btd conference, site tour and Equal Employment Opportunity meeting, tabulation and analysis of results of bidding, recommendations as to award of construction contract and consultation to DIstrict prior to award of construction contract. Plotting, computing and filing descriptions of easements and rights- of-way. 7. Assistance to District in preparing of applications and requests for aid from the state agencies and federal government for construction grants . · 8. Assistance to District In obtaining any pe~j~fts required by local, state or federal governments. 9. Additional copies of operation and maintenance manuals above the num- ber specified to be furnished 'under Article I .A. , Planned Step 2 Engineel Services and handling and mailing of these copies. 10. Preparation and participation In hearings before the State ~Azater Resources Control Board, the Environmental Protection Agency, or other funding or regulatory agencies except as otherwise provided · for in Article I.A, Planned Step 2 Engineering Services. 11. Additional engineering services required to Implement recommendations of the Value Engineering (VE) analysis. 12. Designs prepared at the request of the DIstrict for alternative methods of treatment or construction than those actually designed. These designs do not Include minor changes In design follo~v[ng the 50 percent submittals, providing these minor changes do not conflict ~vlth the scope of design services described in Article I.A. , Planned Step 2 Engineering Services. -4- 13. Assistance to DIstrict in preparing for and meeting with representatives of the SWRCB to discuss Grant Eligibility for the Enc[na Phase II[ ProJect. ' 14. Detailed field verification of as-constructed condition~. 15. Assistance to District in updating the financial plan and revenue program. 16. Assistance to District regarding institutional arrangements. 17. ProvIsion of additional services associated with the preparation of additional contract documents for "fast tracking" part or parts of the project. 18. Provision of engineering services to assist the District in applying for a modification of the secondary treatment requirements. 19. Assistance to District in preparing the Construction !K4anagement Plan required by the State Water Resources Control Board. 20. Assistance as necessary to the construction management consultant. 21. Consultation or other services on matters not otherwise provided in this Agreement. lI. Authorization, Progress and Completion Specific authorization to proceed with the work described in Exhibit "A" shall be granted in writing by the District. The Engineer shall not proceed with the work without such authorization. Such authorization shall set forth the date of commence- ment of the work and the schedule of progress and comp]etion. If the authorization to proceed with the work described in Exhibit "A" occurs subsequent to September 30, 1978, it shall constitute an increase in scope of work and Engineer shall be entitled to an appropriate increase in compensation. For special engineering services, the authorization by the District shall be in writing and shall include the definition of the work to be done, the schedule for commencing and completing the work and the basis for compensation for the work. III. Compensation For the services described in Exhibit "A" which are to be performed by the Engineer, the District agrees to pay, and the Engineer agrees to accept, compen- sation in accordance with the schedules set forth in Exhibit "B" . Compensation for special engineering services shah be as set forth in the written authorization for special services or as specifically detailed in Exhibit "B". -5- IV. Responsibility of Enqineer The Engineer is employed to render a professional service only and any payment made to it is compensation solely for such services as it may render and recommendations it may make in the design of the project. The Engineer makes no warranty, either expressed or implied, as to its findings, recommendations, sp~_c. iftcatton__s_0r pr0f_e._s_s!o. nal advice other than they were promulgated after follow- ing a practice usual to the engineering profession. The Engineer makes no warranty or representation as to his ability to obtain or assist in the obtaining of grants as contemplated herein other than Engineer will use his professional skills in attempting to do so. The Engineer shall indemnify and hold the District and all of its officers, principals, agents and employees harmless from any liability for injuries to persons or damage to property which arise from negligent acts by the Engineer in performing services under this Agreement. V. Inteqration This Agreement represents the entire understanding of District and Engineer as to those matters contained herein. No prior oral or written understanding shall be of any force or effect with respect to those matters covered hereunder. This Agreement may not be modified or altered except in writing signed by the party to be charged. VI. Ownership of Documents Any plans, studies, sketches, drawings or specifications supplied, as herein required, are the property of the District. In the 6vent this contract is terminated, any documents, plans, specifications and drawings shall be delivered forthwith to the District. VII. Subcontracts Engineer shall be entitled, to the extent determined appropriate by the Engineer, to subcontract any portion of the work to be performed under this project. Engineer shall negotiate and administer subcontracts in accordance with Provision 11 of Appendix C-1 to 40 CFR Part 35, Subpart E as published in the Federal Register on December 29, 1976. The Engineer shall be responsible to the District for the actions of persons and firms performing subcontract work. At the time subcontracted services are anticipated, the Engineer shell notify District of the nature of and need for such services and identify the proposed sub- contracting firm. The Engineer must receive written approval from {he District prior to utilization of any subcontractors. -6- The Engineer is authorized by the District to subcontract work having a cost which will not exceed 40 percent of the total amount of compensation due under this Agreement. In the event Engineer desires to subcontract work having a cost in excess of 40 percent, the work shall be subject to the approval of the District and this Agreement shall be amended. V~I. Dlshtct's Pro~ect Officer The Distrlct's Project Officer, who shall be empowered to act for the District in accordance with the provisions of this Agreement, where such acts are not con- h-amy to law or District ordinance, shall be the General Manager of the Encina WaGer Pollution Control Facility or as appointed by the District. IX. EnqLneer's Proiect Officer The Engineer's Project Officer, who shall be empowered to act for the Engineer in accordance ~vith this Agreement in all matters relating to the technical administration of services to be provided, shah be the Engtneer's duly appointed Project Manager for the work. The Project Manager shall be ]v[r. Graham T. Fraser. In the event Mr. Fraser, for any reason, cannot fulfill the duties of the Engineer's Project Manager, the assignment shall be filled by either ~v~r. Donald R. Lee or Mr. A~ichael G. I{oover. The Engineer shall notify .~h.e Di~tric.t., t.n..vyri.t. ir~g, ~.hen. gtrc..u.m.s.ta. nq.es.. require ~ny such change in assignment. Other substitution other than those ind[vlduals listed above shall only be with the prior written approval of the District. X. EPA Requtred Terms and Conditions The "Required Provisions - Consulting Engineering Agreements" as published in the Federal Register dated December 29, 1976 as Appendix C-1 to Part 35 of Title 40 of the Code of Federal Regulations, are attached hereto and incorporated heretn by reference as exhibit "C" . Revisions to VSD-100 Certain of the provisions of this Agreement shall be deemed to supercede and replace paragraphs E and F under Article I of Agreement VSD-100 dated July 13, 1973 and said paragraphs E and F are of no further force or effect. XII. Revised Compensation Any and all provisions in Agreement VSD-100 for compensation to Engineer for services described in Article I paragraphs E and F of said VSD-100 are hereby superceded and replaced by the provisions of this Agreement for Step 2 Engineering Services. -7- XIII. Effective Date This Agreement shall be effective on and from the day and year first above written. IN W'ITNESS WHEREOF, we have hereunto set our hands and seals. ATTEST: VISTA SANITATION DISTRICT /~ean Brooks O'Brien,' Clerk BernTrd Rap Chairman Approved by Resolution No. BROVVN AND CALDVV'ELL a California Corporation 78-27 on June 7, 1978 By r APPROVED AS TO FORM Date EXHIBIT "A" PLANNED STEP 2 ENGINEERING SERVICES The planned engineering services to be provided under this Agreement include: (1) Preliminary Design Serqices and (2) Basic Step 2 Services. A. Preliminary Desfqn Services Preliminary design services are required to properly accomplish the basic Step 2 services. The following prellmlnary design tasks shall be performed by ling tneer: Task 0 - Manaqement Management of Preliminary Design Services Includes supervision of project staff, review of engineering work by managerial level engineers, and correspondence with DIstrict. Task 1 - Procurement and SuDervlsfon of Subcontractors Procurement and superv[slon of subcontractors Includes those services necessary for the procurement of subcontractors for both pr'ellminary design services and basic Step 2 services and supervision of of subcontractors providing preliminary design services. Task 2 - Geotechnical Investfqatton_~s Geotechntcal Investigations over the treatment plant site will be conducted by a qualified geotechnical consultant. The investigations include test borlngs, soil analyses and founda- tion exploration studies to obtain geotechnical data and recommendations necessary for the project d~sign. Task 3- Surveys Surveying of the Encina ~VPGF site will be performed by qualified surveyors. The work includes aerial and ground surveys, detailed layout of existing facilities, establishment of ground control work including lines and grades, base lines, monuments and topo~ilraphy i~nd related office computations and drafting. Task 4 - Preliminary Architectural Preliminary architectural work includes architectural.services necessary for the "10 percent design submittal" required by the State Water Resources Control Board. The work includes consultation, preparation of drawings for the 10 percent submittal and attendance at meetings. A-2 Task S - Corrosion Protection Study Under this task, the project site conditions will be Investigated and a letter report will be prepared to Identify the need to provide a corrosion protection system for piping and appurtenances butted in aggressive soils. Task 6 - Preparation of Preliminary Deslqn Report The work will consist of consultation to the District and preparation of a report which will be an attachment to the Preliminary 10 Percent Design Report (Task 7). The work is necessary because of changes that have occu/red In the plant's discharge requirements, changes tn technology and changes In costs, particularly energy costs, that have occurred since the project report was written in early 1975. In addition, several high maintenance areas have been identified in the existing plant. These areas are to be evaluated to determine the cost- effectiveness of retaining or replacing the equipment. The subtasks to be performed by the Engineer are as follows: 1. Review of Bfoloqtcal Secondary Treatment Process. The revlew will update the alternative analysis sect[on of the project report with respect to the selection of blofiltratlon, activated sludge and a relatively new biological process developed since the project report, i.e. the Rotating Biological Contractors (RBC's). 2. Reviev~ of Submerged Launders and AIr Skimming. Submerged launders and air skimming were recommended for improved oil and grease removal and for odor control. Recent changes in the grease and oil discharge requirements and reported operating difficulties with submerged launders warrants a review of the need for these systems. The need to add helical skimmers to tanks 1 and 2 and the modification of the helfca] skimmer in tank 5 will be reviewed. 3. Review of Odor Control Systems. Odorous air collected from the aerated grit tank, primary sedimentation tanks, all open channels, the sludge dewaterjng building and from the bjofi]ters Is recommended, in the project report, to be deodorized in bio- logical scrubbing towers. Recent reported operating difficulties with similar odor removal systems at other locations suggest that a review of the effectiveness and utility of this system compared with other odor removals systems be conducted. This review is needed to insure the most effective system is provided in view of recent cease and desist orders received by the plant for odorous emissions. 4. Review of Screening and Screening I~andlinq Systems. The projecl report recommends providing one new mechanically cleaned bar screen and screenings grinding pump and the relocatlon of the existing barscreen and grinding pump. Critical depth hydraulic control sections are recommended to be provided downstream of each screen to improve screen efficiency by reducing the rate of flow through the screen. The screenings g~lnder pumps discharge the ground screening back into the flow. This review shall determine if the existing mechanically cleaned screen should be replaced or repaired and also determine special fea- tures to be incorporated in the specifications to reduce future screen maintenance. The need for the proposed hydraulic control sections downstream of the screens will also be reviewed. The review wtll identify and evaluate systems for conveying the screenings to a storage hopper for landfill disposal. Screen- control alternatives wl]l also be evaluated. 5. Review of Grit Systems. The project report recommends utiliz- Ing recessed impellet centrifugal pumps pumping to centrifugal separators and final washing of the heavy fraction from the centrifugal separator in a helical flight type grit washer. The grft Is then discharged to a hopper for land fill disposal. The review wilt identify and evaluate alternative grit removal, separation, conveying and storage systems. 6. Primary Sludge Pumping Stud~,. The project report does not address primary sludge pumping. Recent maintenance reports indicate reduced sludge pump capacity and extremely high sludge pump maintenance. The study will evaluate other types of primary sludge pumping systems and determine if it is cost- effective to replace the existing primary sludge pumps with new lower maintenance pumps. 7. Sludqe Dewaterinq and Cake Handlinq Study. The project report recommends the addition of a second centrtfuge at 9round level in the position reserved for it on the existing centrifuge structure. The existing centrifuge is experiencing high maintenance costs. This study will evaluate alternative sludge alewatering techniques to determine the most cost- effective sludge alewatering system for the Phase III expansion. If centrifuges are found to be cost-effective the study will determine if it is cost-effective to elevate both centrifuges to eliminate the need for the conveyor belt systems. 8. Enerqy Conservation and Reclamation.St__udy: The project report recommends the utilization of sludge gas as a fuel for engines driving on-site power generators, the power so generated to be used for operating other plant equipment. The project report proposed to utilize the heat from the engines as a source of heat for the plant anaerobic digestion process. The Study will identify the best alternative for energy utilization in the Encina WPCF. The study shall identify the amount of energy, requlred under various discharge requirements and quantities of sludge gas available under each treatment arrangement. The following will be examined to determine 'the most cost- effective energy and resource management alternative: a. Full gas management, as proposed In the February 1975 Project Report. b. Utilization of d|gester gas for digester heating only. c. Sale of excess digester gas. - d. Cogeneratlon, tn parallel with the electric utility. e. Direct drive of selected plant loads using gas engines. The study will include an evaluation of overall plant energy and operating costs under each alternative and will Include costs associated ~vith providing necessary standby power for reliability as required by EPA regulations. 9. Biofilter Pumping Station Study. The project report recom- mends four constant speed pumps be provided and variable flows be accommodated by hydraulically varying the recycle quantity to maintain a constant hydraulic load to the b~ofilters. The variation in the recycle rate Is achieved by the action of a weir and the limiting hydraulic capacity of the constant speed pumps. Also, this system minimizes the size of the wet well. The study will reviev~ and compare the cost and utility of this control system with a system with four constant speed pumps, two variable speed pumps and a wet well/dry well system. 10. Btoflocculation Stu~]y. The project report does not include a btoflocculatlon stage bet~veen the biotowers and the secondary sedimentatton tanks. The need for such a facility shall be determined. Task ? - Preparation of the Preliminary ] 0 Percent Design Report The preparation of the Preliminary 10 Percent Design Report will comply with the State ~Arater Resources Control Board Clean ~Arater Grant Bulletin No. 26. The Preliminary Design Report, prepared under Task 6, ~vlll be attached and made part of the Preliminary 10 Percent Design Report for presentation to the Value Engineering (V.E.) team. The information to be prepared, assembled and presented shall be as follows; process schematics, design criteria with suppo,'ting calculations regarding process unit sizing, solids balance sheet and preliminary service building floor plans. A-S Task 8 - Assist ;e Associated with V.E. Analy_ _ Assistance and consultation, as necessary, to the District and the V.E. team by the Engineer before, during and following the conduct of the V.E. analysis. This work includes the response to the comments and recommendations in the value engineers report, and final preparation of the "10 Percent Design Completion Level Submittal" to the State Water Resources Control Board. Additional preliminary design studies requtred as a result of V.E. analysis shall be considered a Special Engineering Service. Task 9 - Review Meetings Preparation for,' travelling and attendance at meetings requested by the Engineer or District to review the preliminary design services described in the foregoing tasks. Review meetings will lnc]ude 3 trips to sewerage agencies within California and one trip outside of California to review treatment processes and techniques applicable to the design of the Ericinn Phase III Expansion. B. Basic Step 2 Services 'The scope of work in the Basic Step 2 Services shall include (1) design tasks and (2) the draft submittal of the Operations and Maintenance Manual for the Phase Enlargement and Upgrading of the EncLna WPCF. The detailed scope of the Basic Step 2 Services will be defined towards the end of the period scheduled for the conduct of the preliminary design services. C. Time Schedule It is intended that the Preliminary Design Services under this agreement be conducted and substantially completed to prepare a detailed scope of work for the Basic Step 2 Services. Specific time schedule for reports to be provided under this Agreement shall be as follows: a. Preliminary 10 Percent Design Report. The 10 Percent Design Report for use by the Value Engineering team shall be submitted to the District within 100 calendar days following the Notice to Proceed. Up to fifteen copies of the Preliminary 10 Percent Design Report shall be delivered to the District. b. 10 Percent Design Completion Level Submittal. The 10 Percent Design Completion Level Submittal required by the State Water Resources Control Board will be submitted to the District within 10 calendar days following receipt of the Value Engineering Team's comments. This schedule shah not apply if there are additional preliminary design studies required as a result of the V.E. Analysis. Up to fifty copies 6f the 10 percent submittal shall be delivered to the District. One unbound copy shall be delivered to the District. c. Basic Step 2 Services_. The 99 percent submittal of the design tasks will be submitted to the District within 304 calendar days following Notice to Proceed. EXHIBIT "B" COMPENSATION A. Compensation Compensation for services provided under Article I, "Scope of Engineering Services" shall be tn accordance with the methods described in this Exhibit and the specific amounts listed In Paragraph C. Compensation Schedule, or as may be later mutually agreed to at the time of authorization, Compensation for each authorized phase of the work or engineering service shall be on the basts of: (1) firm fLxed-price, (2) cost reimbursement, (3) hourly - rate or as may be later mutually agreed to at the time of authorization: I. Firm Fixed-Price Basis Compensation for each phase of the work or engineering service authorized on a firm fixed-price basis shall be as listed In Paragraph 0, Compensation Schedule, of this Exhibit or as may be mutually agreed upon at the time of · authorization. 2- Cost Reimbursement Basis Compensation for each phase of the work or engineering service authorized on a cost reimbursement basis shall be the cost reimbursement plus a fixed professional fee, as defined herein. a. Cost Reimbursement The cost reimbursement portion of the compensation shall be the sum of direct labor costs, indirect costs and other direct costs, as herein defined. The cost reimbursement for each designated engineering service shall not exceed the cost ceiling listed in the compensation schedule without formally amending this Agreement. (1) Direct Labor Costs Direct labor costs shall be the total number of hours worked on the job by each employee times the regular rate for such employee's labor category. Direct labor costs for principals, who are defined as professional engineers assigned to the corporate staff of Engineer, will be based upon the actual rate of pay for those individuals. Direct labor rates shall be revised annually for periods of October 1 through September 30 to generally reflect relevant changes in the U.S. Department of Commerce Consumer Price Index. (2) Indirect Costs Indirect costs shall be the product of all direct labor costs multiplied by an overhead rate. A billing overhead rate of 1.45 shall be used for interim reimbursement purposes. The Engineer, as soon as possible but not later than ninety (90) days after the expiration of his fiscal year, or such othe~ period as may be mutually agreed upon, shall submit to the District a proposed provisional over- head rate or rates for that period based on the Englneer's actual cost experience during that period, together with supporting cost data. Negotiation of provisional overhead rates by the Engineer and the District shall be undeFtaken as promptly as practicable after receipt of the Engineer's proposal. Allowability of costs and acceptability of cost allocatior~ methods shall be determined in accordance with the applicable portions of the Federal Procurement Regulations, 41 CFR 1-15.4 as in effect on the date of this Agreement. The results of each negotiation shall be set forth in an amendment to this Agreement, which shall specify (1) the agreed negotiated provisional rates (2) the bases to which the rates apply, and (3) the periods for which the rates apply. Pending establishment of negotiated provisional overhead rates for any period, Engineer shall be reimbursed at billing overhead rates as provided In the Agrement, subject to appro- priate adjustment when the negotiated provisional rates for that period are established. To prevent substantial over or under payment, and to apply either retroactively or prospectively, billing overhead rates may, at the request of either party, be revised by mutual agreement. Any such revision of billing over- head rates shall be set forth in an amendment to this Agreement. Any failure by the parties to agree on any rates under this clause shall be subject to the "Remedies" clause (Provision No. 6, · Exhibit "C") of this Agreement. Negotiated provisional overhead rates negotiated by the parties to this Agreement shall be used to adjust all interim billings as soon as such rates are established. Negotiated provisional overhead rates shall be subject to review and revision by the cognizant audit authority'designated by the EPA Project Officer, and shall b~ adjusted either upward or downward in accordance with EPA rulings following interim or final audits. Indirect costs for cost reimbursement work under this Agreement shall be the product of direct labor costs multi- plied by the final audited overhead rate. B-2 (3) Other Direct Costs Other direct costs shall be billed at cost and shall include the following: ia) Services d [r~ctly applicable to the work such as computer rental anc~ p~ugramming costs, special consultants, borlngs, laboratory charges, commercial printing and binding, and similar costs that are not applicable to general overhead. (b) Identifiable reproduction costs applicable to the wgrk such as printing of drawings, photostating, multi- lithtng, printing and similar costs. (c) Identifiable communication expenses such as long distance telephone, telegraph, cable, express charges, and postage other than for general corre- · spondence. (d) Living and traveling expenses of employees when away from home office on business connected with work except for automobile travel which shall be billed at the rate of 20 cents per mile. (f) Subcontracted seFcices. Costs described above shall be payable up to a cost ceiling listed in the compensation schedule. In the event the entire scope of work provided for undeF a cost reimbursement engineering service is not completed within the cost ceiling established for such a service, Engineer shall continue with all or any part of the %york for which an amended cost ceiling is established, but not othersvise b. Fixed Professional Fee The fixed professional fee portion of the compensation shall be the amount listed in the compensation schedule and it shall not be increased except in the event there is an amendment to this Agreement that increases the scope of work. 3. Hourly Rate Bas_i_s Compensation for each phase of the work or engineering service authorize on an hourly rate basis shall be the sum of direct salary costs and direct non- salary costs, as herein defined. B-3 a. DIrect Sa]aFy Cost Direct saIaFy cost shall be the total number of hours worked on the job by each employee times an hourly btlltng rate for such employee's labor category. The hourly billing rate for each employee category shall be the sum of: (1) the regular dlrect labor rate, (2) the Indirect costs rate and (3) a professional fee rate. DIrect salary rates shall be - revlsed annually for periods of October 1 through September 30 to generally reflect relevant changes tn engineering salary costs and relevant changes in engineering salary costs and relevant changes In the U.G. Department of Commerce Consumer Price Index. b. Direct Nonsalary Cost Direct nonsalary cost shall be actual costs and shah include the following: (1) Services directly applicable to the work such as computer rental and programming costs, specfat consultants, horfngs, ]sbora[ory charges, commercial printing and binding, and similar costs that are no~ applicable to general overhead. (2) Identifiable reproduction costs applicable to the work such a s printing or drawing s, photostating, multilithlng, printing and similar costs. (3) Identifiable communication expenses such as long distance telephone, telegraph, cable, express charges, and postage other than for general correspondence. (4) Living and traveling expenses of employees when away from home office on business connected with work except for automobile travel which shall be billed at the rate of 20 cents per mile. (5) Subcontracted services. Compensation for any engineering service on an hourly rate bas~s shall not exceed the pric~ ceiling listed in the compensation schedule for given service, or if none is shown, shall not exceed the price ceiling agreed to at the time of authorization of the service, without approval by the District's Project Officer. In the event the entire scope of work proxrided for under an hourly rate engineering service is not completed within the cost ceiling established for such service, Engineer shall continue with all or any part of the work for which an increased cost ceiling is established, but not otherwise. B-4 4. Limitation on Cost and Time a. The estimated cost ceiling (for services authorized on a cost reimbursement basis) and the price ceiling (for services authorized on an hourly rate basis) given in Paragraph C of this Exhibit and the time for completion given in the authorization will not be exceeded. The Engineer agrees to use his best efforts to perform the work specified in Addcle I within the estimated cost and time of completion. If, at any time, the Engineer has reason to believe that the estimated cost ceiling or price ceiling will be greater or substantially less than the ceilings indicated in Paragraph C, the Engineer will notify the DIstrict in writing to that effect. The notification will state the revised estimated cost ceiling or price ceiling for performance of the services and, If applicable, the revised time for completion. Such notification will be submitted to the District at the earliest possible date and in no event later than 30 days prior to scheduled completion of the work. b. The District shall not be obligated to reimburse the Engineer for costs incurred in excess of the estimated cost ceiling or price ceiling set forth in Paragraph C. The Engineer shall not be obligated to continue per- formance under the agreement or otherwise [ncLLr costs in excess of the estimated cost ceiling or price ceiling set forth in Paragraph C, unless and until the District shall have notified the Engineer in writing that such esti- mated cost ceiling or price ceiling has been increased and shah have, specified in such notice a revised estimated cost ceiling or price ceiling which shall thereupon constitute the estimated cost ceiling or price ceiling for performance of this agreement. c. If, after such notification, additional funds are not allotted by the end of the period scheduled for completion, or an agreed date substituted therefor, the District will, upon Mitten request by the Engineer, terminate this agreement pursuant to the provisions of the termination clause. The termination date shall be the originally scheduled completion date or an agreed date substituted therefor. If the Engineer, in the exercise of his reasonable judgment, estimates that the funds available will allow him to continue to perform services covered in this agreement for a period extending Beyond such date, he shall specify the later date in his request, and the District, at his discretion may terminate this agreement at that later date. d. Unless there is an agreed upon increase In the Scope of XVork from that outlined in Exhibit A, Engineer agrees that the maximum cost ceiling set forth in Paragraph C shall not be exceeded. e. It is understood and agreed that time is of the essence in the performance of this agreement, in that should the services agreed herein to be performed by Engineer not be completed within the time set forth herein from the State of California and the United States Government to the extent ~f 87-1/2 percent of the ultimate cost of Step 2 Design Services, resulting in consequential damages to District. It is understood and agreed that the District will provide timely input and decisions to the Engineer regarding the work outlined In Exhibit A. B-5 B. Payment of Compensation Charges determined on the basis of this exhibit shall be billed monthly to the District and payment in full by the District shall be made within a reasonable period of time. Brief monthly progress reports shall be included with the Invoices and shall Include a summary of activities related to progress of the project for the Invoiced period. Monthly Invoices shall contain the following information for each type of compensation: 1. Cost Reimbursement Basis For the cost reimbursement portion of the compensation, Invoices shall include the following: (1) each labor category and the total number of hours worked by employees in that category, (2) direct labor rate and costs for each labor category, (3) total indirect costs, and (4) each general category of other direct costs. For the fixed professional fee port[on of the compen- sation, invoices shall include the percent of the total fixed professional fee to be paid each month in accordance with the tabulated amounts shown for each engineering service listed in the compensation schedule. 2. Hourly Rate Basi__s Invoices for engineering servlces authorized on an hourly rate basis shall include the following: (1) each labor category and the total number of hours worked by employees in that category, (2) the hourly billing rate and costs for each labor category, and (3) each general category of other direct costs. C. Compensation Schedule For each engineering service authorized under this Agreement, compensation shall be in accordance with the applicable portions of this Agreement and the following schedule: 1. Planned Enqineerinq Services Compensation for the planned engineering services (Article I.A.) shall be as follows: a. PreI[minary Desiqn Services (Exhibit "A", Paraqraph A) Basis of compensation: Cost Reimbursement Estimated Cost ceiling $ 189,004 Fixed professional fee $ 21,772 Portion of ftxed professional fee, payable monthly l/z] Unless there is an agreed upon increase in the Scope of Work from that outlined In Exhibit A, Paragraph A, Engineer agrees that the maximum cost ceiling allowed shall be $ 218,000. a. Basic Step 2 Services (Exhibit "A", Paraqraph B) Compensation for these services shall be on a cost reimbursement basis. The compensation shall be determined by mutual agreement between District and Engineer prior to authorization. 2. Special Enqlneerinq Services Compensation for special engineering services (Article I. Bo) shall be agreed to at the time of authorization. An allowance of $ 200,000 shall be established for such special engineering services as may be authorized by the Distrfct's Project Officer in accordance with Article II. This allowance shall not be increased without an amendment of this Agreement. D(HIBIT "C" RULES AND REGULATIONS Title 40---Proted;on of Environment (,)The Englnee~ ~h~ll t>e re~?ortslSte foe CHAPTER t--ENVIRONMENTAL the. profe:...Ioll~l qu.itty. ~hnlctl =cc~r~c~. ~OIECTION AGENCY UrneLy completion. and the c~dtn~tlon [}~ 655-2] under ~ts a~reement. The ~tnetr PAHT 3~STATE AND LOCAL ~lthou~ ad~Uon~l compe~s~Uo~. ASSI~ANCE zevtH mn~ ermm. o:n1~ton~ or older de~clen- · ~b3~reements Under Grants for Con- %c~orts 8Dd other ~ervlceL struct;on of Treatment Works; Technical (b) ~e ~n~tneer ~h~lZ perform such pro- ~nder th~ ~r~ment, In b~dan~ (c) Appro~&l b~ the Owaer or DA or · IcE:OERAI. REGISiF. R, VOL. 41, NO. 251--WE[;'NESDAYo DECEMBER 29, 1976 C-1 RULES AND REGULATIONS ,'_' 7.s.~.toa ot t.h~ C,~aer. zr,j~de as preytried la ~r~p~ (c) or thb n~r. t, :Rdn~ 6nd (2) aG 0pp0r~unl~ lot coG- p~rnSrRph (b) Or this cli~ sh~l Bp~t~. (d) ~o E~ln~r ~h~ll ro~o~ ~ the Owner F~pl~ (~) through (c) ot ~hls cln~ff bl FEDERAL REGISTER, VOL. 41, NO. 251~V~EDNESDAY, DECEh~,BE;~ 29, 1976 RULES AND REGULATIONS services. selection procedurc,~ u~ccl, and {?) Suba~rccmcn~s nv~nrdc~ on the negotiation mcthod~loxy ~k~cd. ~ ~e b~ls of review of ~ cos~ clcmcn~ s~n- ~ 35.937--~ ~r~>~;sl;on. c~sc~ where H 35.937-2. 35.937-3 ~nd ~ns~ry nnd s ccrtlfic~tlon of coznple~, (s) Gr~ ~rc res~ns~ble for ncgo- 35.937~ ~ applicable, (it) U~c cost anti current and ~cura~ cost and prlcJng ti~Uon ot their contmc~ for archt~c- pricing d~ta submired by the select~ data sh~ll be subJ~t ~ down~.ard tu~l or cnglnccrlng ~c~lces. Coatmet engineer, (lID ~ certification of rcvlcw negotiation or r~oupmcnt of procukcmcnt ~nclud~ng ncgo~ntton n~ay nnd ncccp~H~cc of the selected engincer's ~hcrc the Regional Ad~nlnlstra~r de- bc performed by thc Krnntcc directly or cost or price. and (iv) a copy of the pro- tcrmln~ that soch certification wzo not by nno~cr non-F~ctal govcrnmcn~l posed sub~grccmcnt document. ~c EPA b~scd on complete, current and accurate body, person or arm rc~dncd for the Project OHlccr will review ~c complc~ cost ~d pricing d~ or not b~scd on purpose. Contract ncgotlntfon.~ may in- subaRrccmcnt action and approve the co~ allowable under the aDpropria~ elude ~e services of tcchn~c~l, legal, 8nntce's compliance- with npproprln~ FPR cost prlnclpl~ (41 CFI~ 1-152 and ~udlt or othcr spcclul~ ~ the extent pzoccdurcs prior ~ award ot the sub- 1-154) at the Lime of award. dccn~c~ approprinLc. n~=ccn~cnL ~c grnn~c shall be z~otl~cd ~ 3~.937-7 ProilL =b) Ncf~ottaLions shall bc conduck'd 1,~ upon completion of review. accordance ~'Rh tl~c principles of Pub. (c~ Cost reviews. (1) A review ot pro- The objective of negotiations shall he L. 92-582, 40 U.S.C. 541-5~4 ~co nz ~o ~ v posed subagrccmcnL cos~ shall be made the exercise o[ sound bustn~s Judgment known ~ the Brooks ~lll and lncorpo- by the graz~e, and good ndminisLr~ttvc practice lnclud- i'ntcd in ~deral procuzcmcnt rc~ulatioz~ 12, As u ollHhnum. prol~scd subagree- ing the detcrmlnatton of a fair and ren- aL 41 C~ 1~.10) or In accordance with mcnt cos~ ~hall bc preached In sum- sonable pro~ b~cd on the flrtn's St~ or local procedures. m:H'y format prescribed by the Adminls- s~ption of risk and Input ~ ~1 sc~ The object of l~cgotlatlon5 with trn~r nnd shall be supporLcd by n cer~t- pcrformuncc Gad not merely Lhc nppll- nny candld~ shall b~ ~ rcnch agree- fleaLion executed hy ~e sclcc~d engineer cation of ~ prcdc~rmh~cd pcrCCH~RC mcnt On the provlsio~ of the proposed that proposed cos~ rcflcct complete. cur- f~ctor. For the purist of subn~rccmcnts e0nts'ncL The gznntcc and the cnndidn~ tent and accurn~ cost and pricing dn~ undcr EPA gran~. proof is dc~ncd n~ the ~hn]l discuss, as ~ rainimp: ~pplicnble ~ the date of nntlcij~a~d net procce~ obtah~cd by dcducth~R nll sl) The scope ~nd cxtcn~ 0f ~'ork aH~tl subagreement award. nllowablccos~ (directand lndirecD from othcz esbcnLlnl requirement; (3~ In addition to the s~clflc tic- the price. (Bcc~sc Oils definition z2z ldcntt~catlon of the personnel and men~ of cost, the cstlma~d amount of pro~c ~ b~sed on Fedcrnl pr~urcmcn~ facilities necc~a~ ~ accom~Hsh the profit shah be set forth scparn~ly In ~e principles, It may vary from O~c Brtn's work wRhin the acquired time, Is~ch~dh~g cost summn~ for fixed price contrac~ dc~nltfon 0f profit for othcr Dutposu.) ~here needed. employment or addllionn] and a maximum totM dollar amount of ProRt on s suba~rccmcnt and each pc~sonncl, 5ubco~tz'acting, joint ~cn- profit shall be set forth scparntcly ~ nmcndmcnt to a 5ubagrccmcnt under a lures. c~.: the cost su~nmary for cost re,burst- grant should ~ subcleat ~ attract cngl- ~3, P~ovision o~ d~c acquired ~chnical zncnt contract. nccrs who poss~ ~len~ and skills n~- cssary ~ the accompl~hmcnC of proJ~t scrvlc~ h~ accordance ~'lth Tcgulntlo~ (4} More dc~Hcd cost dn~ th~n that objectives. Bad ~ stimulate e~clent nnd critciin ~bll~hcd for the piuJ~'t: ~cqulrcd by the summary format m~y be cxpc~itlo~ completion of the proJ~t. ~nd required by ~e grnn~c to substantln~ ~Vhere cost revicw ~ pcaformcd. the ,4, A fair as~d ~ c~onable price for the rc~son~blcnc~ of proposed ~ubagree- mate of prowl should be :cvlc'~'cd by the the rc~uiscd ~ozk, ~ ~ dctczrnh~cd h~ meat cos~. Such detailed document- grantcensareallo~crclemcn~ofprlce. accordance with the cost and profit co~- lion ~ normally r~utrcd by EPA 0nly sldcrnOozu set for~ In il 35.93~-6 and when the sclcc~d engineer ~ unable ~ 35.937-1. and pa}mcnt paovlslons. certify that the cost and prlc[n~ da~ ~cd arc Complete. current and nccurate. ~ 3~.9~7~ ~,,-I ms,~ pr;t~ ,'~as-~,J,'r;,- EPA may. on a scl~tcd basis. perform ra$ General ]~ ~ ~c )~c~' o~ EPA agrcczncnt. ~or~a]ly. n l~rovL~on~] over- that the cos~ or price ol ~1 subagree- hcnd rntc will bc n~rccd u~on ~rlor coz~dcrcd. For c~h subagrccmcnt ~n e~- (5~ App~oprla~ consldcrntlon should' ten of SlO.0O0 b~t not grca~r thnn bc ~tvcn ~ ~ 30.710 of this subc~ap[er ~10O.000. g~n~es ~ha~ ~se ~c p~*e- which contains ~cncrn] co~t p~nclp]~ dures desca~ed in paragraph $cs of ~i~ which m~t be ~cd for the dctermlna- sectran or 8n ~ivBlcnt pr~e~. Uon of the allowability of co~ under {b) ~ub~rcc~ucnts o~er 3~OO.OOO. ~z* gr~nts. The cn~h~ccr's nct~nl co~L~. direct each subagreement cxp~d to c~cccd ~nd lssdlrcct. nl]ownb]c for Fcdcrnl ~100.000. or for t~o sub~recmcn~ n'hic]~ tlc~p~tlon shall bc dc~r~[ncd In nccord- a~gzcg~t~ anorc O~n SIO0.000 n~n,dcd nncc ~'ith the terms nnd condlHons o[ to nn engineer ~or work on one step. us* L~c subn~ ccrncnt this ~u~Dnrt and the ~hc~e zcncgotlntlon or an~cndmcnt of a cost principles Included In 41 C~ 1-15.2 suba~recmcnt wUl result In a contrac~ nz~d 1-15.4. Exagnp]~ of cos~ which arc Dzicc In cxc~ ol $1OO.00O. or ~'hezc the. not allowable under those cost prince- ' 8m~d~neBt Itself ~ tn cxcc~ of ~lo0.00~. pies Include. but arc not ]iml~d ~. ca- the paovL~ion~ o[ th~ ~a~agznp~ ~b, tcrtnlnmcnt. Interest on borrowed capital .~hall nPpb'. and bad dcb~s. ~1) The ca~didate,s, selected fur he- (G} The engineer shall have nn gotintion shall submit to lhe gl no~e los counting system which accoun~ for review su~eient cost nnd pricing dnla In nccord;tnce with gencr;tHy ncccpted a~ dc~cx'ib~ in para~xaph .c) of th~ nccountlug prhsclplcs. This sy~ ~hnll sectio~ ~ ennhle the grantee to ~:.c~- provide for the Identification. nccumuI~- cos~ ~nd Bn~oun~ propped. ns~d thc unnllo~nblc project costs ~H~on~ DroJ- allo~bility aBd eligibility of cost~ px0- ec~. Allowable project costs shall be ~2~ The Bpphc~tnt, grnn~e shall sub- {c~5~ of this sections. The engineer mlt ~ the EPA Project O~ccr for review mu~t px'opo~e and account for cosa In ~ {1, documen~tlon of ~e public notice manner cons~tcnt with hla norm~fl